Carrier
50VQP084-300
specifications
Troubleshooting
Install
Field Power Supply Wiring
Dimension
Checklist
Service
Unit Start-Up Cooling Mode
Page 44
Page 43
Page 45
Image 44
Page 43
Page 45
Contents
Contents
Safety Considerations
Installation
General
50VQP Unit Physical Data
406
442
782
50VQP084-150 Unit Dimensions
A50-8436
50VQP168-300 Unit Dimensions
A50-8437
A50-8468
A50-8466
A50-8467
A50-8469
A50-8470
A50-8471
A50-8472
A50-8476
A50-8477
A50-8478
A50-8479
A50-8482
A50-8485
A50-8483
A50-8484
A50-8486
Trap Condensate Drain
Field Power Supply Wiring
Water Quality Guidelines
A50-8438
50VQP084-168 Unit with Complete C Control Typical
A50-8439
50VQP084-168 with Deluxe D Control Typical
J1 J8
AL1
J6J5
50VQP Unit Electrical Data Dual Point Power Unit
50VQP Unit Electrical Data Standard Unit
Field Control Wiring
PRE-START-UP
A50- 6268tf.tif
A50-8441
Page
50VQP084 Blower Performance Data
50VQP096 Blower Performance Data
412 455 492 526 563 595 628 658 687 718 745
421 459 499 533 569 600 633 663 691 722 749
441 478 513 549 581 614 644 672 703 730 759
456 495 529 561 595 625 656 685 712 741 767
50VQP120 Blower Performance Data
511 544 578 608 637 668 695 722 748 776 800 825 849 874 897
526 561 592 621 649 679 706 732 758 785 809 833 857 882
544 575 605 633 661 691 717 742 767 794 818 842 867 890
555 589 618 646 676 702 728 753 779 803 827 850 875 898
50VQP150 Blower Performance Data
581 613 646 678 706 735 763 791 817 842 867 889 912 935 958
598 623 656 687 715 744 772 799 825 850 872 896 919 942 963
605 637 666 697 727 755 783 809 835 858 882 905 928 951 973
618 647 678 708 738 766 793 819 844 867 891 914 937 959 980
50VQP168 Blower Performance Data
50VQP192 Blower Performance Data
BkW 3020.8 Sheave/Mtr
50VQP240 Blower Performance Data
605 633 660 689 714 739 763 790 813 836 858 882 904
50VQP300 Blower Performance Data
538 574 609 640 673 703 733 761 788 812 838 863 888 912
553 588 620 653 685 715 744 771 796 822 847 872 896
568 602 633 666 697 726 755 782 806 832 857 881 904
581 613 646 678 706 735 763 791 817 842 867 889
Field Selectable Inputs
Complete C Control Jumper Settings See Fig
Deluxe D Control Jumper Settings See Fig
DIP Switch Block S2 Accessory 1 Relay Options
DIP Switch Block S2 Accessory 2 Relay Options
START-UP
Operating Limits
Unit Start-Up Cooling Mode
Unit Start-Up Heating Mode
Water Temperature Change Through Heat Exchanger
50VQP Unit Operating Limits
Approximate Fluid Volume L Per 30 M of Pipe
Antifreeze Percentages by Volume
Operation
Coaxial Water Pressure Drop
Complete C and Deluxe D Board System Test
Units with Aquazone Complete C Control
Units with Aquazone Deluxe D Control
Complete C Control LED Code Fault Descriptions
Service
Aquazone Deluxe D Control LED Indica
Air Coil Fan Motor Removal
Troubleshooting
Refrigerant Charging
A50-8163
FP1 and FP2 Thermistor Location
Troubleshooting
Unit Does Not Operate
Page
Page
Copyright 2010 Carrier Corporation
Catalog No Form 50VQP-C1SI 11-10
50VQP START-UP Checklist
II. START-UP
Book Catalog No
Form 62AQ-1SI Pg CL-1 Replaces New Tab
Heating Cycle Analysis
Cooling Cycle Analysis
Related pages
Troubleshooting for Planar PT1945P
Refer to for the Isdn LAN Modem specifications for 3Com 3C892
Messages and error codes for Toshiba e-STUDIO500P
Introduction WP-2510 floor diagram for Powermatic WP2510
When the Manual mode is selected for Denon AVR-5700
General Memory Module Installation Guidelines for Dell QHB
Exploded Views and Parts Lists for Generac Power Systems 5253
Appendix B Country code list for parental lock for JVC LET0141-002A
What power supply is required for the MTP DA8?
Check here
Top
Page
Image
Contents