AEG TKS-CS operating instructions Dimensions, Low-Voltage Box

Page 10

Compact Station TKS-CS - Operating Instructions

4.2Dimensions

Figure 2 - Compact station side views

Dimension

[mm]

Height of metal housing with roof

1686.5

 

 

Height of concrete base

780

MH depth (roof)

1750 (1804)

 

 

MH width (roof)

2900 (2954)

 

 

Table 1 - Dimensions

4.3Low-Voltage Box

1

2

3

4

5

Figure 3 - Low-voltage box (example)

1Central earthing system

2Communications cabinet PV.LoG-MH

3Load interrupter switch, 3-pin

4LV connections with protective cover

6 7

5ISO small distribution box

6Battery cabinet

7Socket outlet with earthing contact

Page 10 of 39

8000043213 BAL

Image 10
Contents TKS-CS Revision Service Status Revision Date NameTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com Appropriate Use General InformationValidity List of AbbreviationsInstallation Location SafetyLightning Protection Scope of Delivery Available to orderEquipment Specifications StructureDimension DimensionsLow-Voltage Box AC Connections Low-voltage boxes exampleISO Small Distribution Box Communications Cabinet PV LoG-MH Central Earthing SystemMedium-Voltage System No. H07V-KNameTransformer 3 4 5 4Functional Description Transfer stationTransport Suspended loads during transportAssembly Setting in PlaceHinge side of the door when closing InstallationConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Operation Start-upWorking with voltages up to 1 kV Residual voltage from capacitors ServicingContact with voltage Contact with leakage currentHeat generation in resistors Insufficient ventilation of equipmentEntry of water into electrical equipment Obligation to Keep a Written Record Maintenance and Inspection Visual Inspection CleaningTesting/Measuring Functional TestReplacing the Axial Ventilator Care LubricationRotating parts Replacement Work Replacing the Transformer Testing after RepairsRepairs Roof structure Station frame Station roofReplacing the MV Switchgear Partial top view TKS-CS exampleMonthly Maintenance ScheduleOngoing Every 6 monthsEvery 2 years Storing Spare PartsAnnually Every 4 yearsRemoving Connection Cables Decommissioning and DismantlingDismantling Disposal Statutory Provisions Chemical System ComponentsCompact Station TKS-CS Operating Instructions List of Tables List of Figures