AEG TKS-CS operating instructions Storing Spare Parts, Annually, Every 2 years, Every 4 years

Page 35

Compact Station TKS-CS - Operating Instructions

Annually

Measuring and monitoring devices must comply with the VDE 0413 standard.

Check and calibrate all measuring instruments.

Check that the equipment as a whole is in perfect working order:

-Check housing and roof structure for damage

-Check line connections for dirt and corrosion

-Check protective covers for damage and check their fastenings

Check all input, monitoring and output values in the equipment and also in interaction with the external control system. Check the control behaviour of the equipment and readjust, correct or change the limit values if required.

Check the function of the peripheral connections, i.e. all connections of the various accessory systems, and repair them if required.

Clean the equipment to minimise creepage currents (do not use water).

Comply with BGV A3, DIN VDE 0105-100 during this process.

Check that the safety signs are complete and legible, and replace if required.

(Must be checked by an expert every 2 years.)

Check the function of the lighting in the compact station, and replace if necessary.

Every 2 years

Check of the safety signs in the operating area and in the equipment by an expert.

Every 4 years

Replace the axial ventilator and clean the weather-proof cover.

10.5Storing Spare Parts

iWhen ordering spare parts, you must provide the component designation, installation location and component number as well as the unit number of the component.

The AEG PS customer service department will be happy to send you a spare parts list on request.

8000043213 BAL

Page 35 of 39

Image 35
Contents TKS-CS Status Revision Date Name Revision ServiceTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com List of Abbreviations General InformationValidity Appropriate UseLightning Protection SafetyInstallation Location Available to order Scope of DeliveryStructure Equipment SpecificationsLow-Voltage Box DimensionsDimension Low-voltage boxes example AC ConnectionsISO Small Distribution Box Central Earthing System Communications Cabinet PV LoG-MHNo. H07V-KName Medium-Voltage System3 4 5 4 TransformerTransfer station Functional DescriptionSuspended loads during transport TransportSetting in Place AssemblyConnection Design Torque InstallationHinge side of the door when closing Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Working with voltages up to 1 kV Start-upOperation Contact with leakage current ServicingContact with voltage Residual voltage from capacitorsEntry of water into electrical equipment Insufficient ventilation of equipmentHeat generation in resistors Obligation to Keep a Written Record Cleaning Maintenance and Inspection Visual InspectionFunctional Test Testing/MeasuringRotating parts Care LubricationReplacing the Axial Ventilator Repairs Testing after RepairsReplacement Work Replacing the Transformer Station roof Roof structure Station framePartial top view TKS-CS example Replacing the MV SwitchgearEvery 6 months Maintenance ScheduleOngoing MonthlyEvery 4 years Storing Spare PartsAnnually Every 2 yearsDismantling Decommissioning and DismantlingRemoving Connection Cables Chemical System Components Disposal Statutory ProvisionsCompact Station TKS-CS Operating Instructions List of Figures List of Tables