AEG TKS-CS operating instructions Start-up, Operation, Working with voltages up to 1 kV

Page 24

Compact Station TKS-CS - Operating Instructions

8 Start-up

DANGER

Working with voltages up to 1 kV

Risk to life due to electric shock.

Comply with BGV A3, DIN VDE 0105-100 (EN 50110, IEC 61243).

Skilled personnel with a Working with Live Current certificate.

Special AEG Power Solutions software and hardware tools must be used for initial start-up. Only skilled personnel trained by AEG PS are in a position to use these tools correctly and to perform initial start-up.

Once the equipment has been fully installed, the following aspects must be checked:

Screw connections properly tightened

Cable connections properly established

Tools removed

Protective covers properly installed

9 Operation

The system is operated as a result of power emerging from the Protect PV inverter; this is determined by the power plant control system.

Page 24 of 39

8000043213 BAL

Image 24
Contents TKS-CS Revision Service Status Revision Date NameTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com General Information ValidityAppropriate Use List of AbbreviationsSafety Installation LocationLightning Protection Scope of Delivery Available to orderEquipment Specifications StructureDimensions DimensionLow-Voltage Box AC Connections Low-voltage boxes exampleISO Small Distribution Box Communications Cabinet PV LoG-MH Central Earthing SystemMedium-Voltage System No. H07V-KNameTransformer 3 4 5 4Functional Description Transfer stationTransport Suspended loads during transportAssembly Setting in PlaceInstallation Hinge side of the door when closingConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Start-up OperationWorking with voltages up to 1 kV Servicing Contact with voltageResidual voltage from capacitors Contact with leakage currentInsufficient ventilation of equipment Heat generation in resistorsEntry of water into electrical equipment Obligation to Keep a Written Record Maintenance and Inspection Visual Inspection CleaningTesting/Measuring Functional TestCare Lubrication Replacing the Axial VentilatorRotating parts Testing after Repairs Replacement Work Replacing the TransformerRepairs Roof structure Station frame Station roofReplacing the MV Switchgear Partial top view TKS-CS exampleMaintenance Schedule OngoingMonthly Every 6 monthsStoring Spare Parts AnnuallyEvery 2 years Every 4 yearsDecommissioning and Dismantling Removing Connection CablesDismantling Disposal Statutory Provisions Chemical System ComponentsCompact Station TKS-CS Operating Instructions List of Tables List of Figures