AEG TKS-CS operating instructions List of Tables, List of Figures

Page 39

Compact Station TKS-CS - Operating Instructions

List of Tables

Table 1 - Dimensions

10

Table 2

- Fuses

12

Table 3

- Potential equalising strip

14

Table 4

- LV box connections

19

Table 5

- Tightening torques

23

List of Figures

Figure 1 - Compact station TKS-CS

9

Figure 2 - Compact station side views

10

Figure 3 - Low-voltage box (example)

10

Figure 4 - Low-voltage boxes (example)

11

Figure 5 - ISO small distribution box (example)

12

Figure 6 - PV.LoG-MH (example)

13

Figure 7 - Central earthing system (example)

13

Figure 8 - MV switchgear (example)

14

Figure 9 - Transformer (example)

15

Figure 10 - Equipment diagram (example)

16

Figure 11 - Crane transport

17

Figure 12 - Setting the compact station in place

18

Figure 13 - LV box

19

Figure 14 - ISO small distribution box (example)

20

Figure 15 - Medium-voltage system (example)

21

Figure 16 - Transformer (example)

22

Figure 17 - Replacing the axial ventilator

30

Figure 18 - Replacing the transformer, 1 (example)

31

Figure 19 - Station roof

32

Figure 20 - Replacing the transformer, 2 (example)

32

Figure 21 - Partial top view TKS-CS (example)

33

8000043213 BAL

Page 39 of 39

Image 39
Contents TKS-CS Status Revision Date Name Revision ServiceTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com List of Abbreviations General InformationValidity Appropriate UseSafety Installation LocationLightning Protection Available to order Scope of DeliveryStructure Equipment SpecificationsDimensions DimensionLow-Voltage Box Low-voltage boxes example AC ConnectionsISO Small Distribution Box Central Earthing System Communications Cabinet PV LoG-MHNo. H07V-KName Medium-Voltage System3 4 5 4 TransformerTransfer station Functional DescriptionSuspended loads during transport TransportSetting in Place AssemblyInstallation Hinge side of the door when closingConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Start-up OperationWorking with voltages up to 1 kV Contact with leakage current ServicingContact with voltage Residual voltage from capacitorsInsufficient ventilation of equipment Heat generation in resistorsEntry of water into electrical equipment Obligation to Keep a Written Record Cleaning Maintenance and Inspection Visual InspectionFunctional Test Testing/MeasuringCare Lubrication Replacing the Axial VentilatorRotating parts Testing after Repairs Replacement Work Replacing the TransformerRepairs Station roof Roof structure Station framePartial top view TKS-CS example Replacing the MV SwitchgearEvery 6 months Maintenance ScheduleOngoing MonthlyEvery 4 years Storing Spare PartsAnnually Every 2 yearsDecommissioning and Dismantling Removing Connection CablesDismantling Chemical System Components Disposal Statutory ProvisionsCompact Station TKS-CS Operating Instructions List of Figures List of Tables