AEG TKS-CS operating instructions Disposal Statutory Provisions, Chemical System Components

Page 37

Compact Station TKS-CS - Operating Instructions

DANGER

Toppling of cargo during transport by industrial trucks

Possibility of death or crushing.

Lift cargo under its centre of gravity.

Secure the cargo and danger zone.

Wear personal protective equipment.

If necessary, secure the transformer to prevent it slipping.

Attach suitable load-carrying equipment to the compact station (using the transport eyelets on the concrete base).

Lift the equipment carefully and remove cables.

11.3Disposal

11.3.1Statutory Provisions

Equipment at the end of its life is electrical scrap.

In commercial contexts, the manufacturer is responsible for the disposal of electrical scrap unless otherwise agreed. Electrical scrap must always be disposed of by an expert.

Electrical and electronic scrap may only be disposed of in compliance with local legislation and regulations German Electrical and Electronic Equipment Act, 2002/96/EC (WEEE) and the Basel Convention.

Electronic scrap consists of valuable materials which can be reclaimed as secondary raw materials, but it also contains environmentally harmful substances.

Commercial disposal companies have information on the best way to recycle material (e.g. in the form of a Recycling Handbook).

For example, it is possible to recycle:

PCBs and circuit boards

Electronic components, EPROMs, ICs and relays

Chips, processors, hard disks and drives

Batteries

11.3.2Chemical System Components

AEG PS complies with the restrictions on the use of hazardous substances in electrical and electronic units according to the German Electric and Electronic Equipment Act Section 5 (2002/95/EC).

8000043213 BAL

Page 37 of 39

Image 37
Contents TKS-CS Status Revision Date Name Revision ServiceTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com Validity General InformationAppropriate Use List of AbbreviationsInstallation Location SafetyLightning Protection Available to order Scope of DeliveryStructure Equipment SpecificationsDimension DimensionsLow-Voltage Box Low-voltage boxes example AC ConnectionsISO Small Distribution Box Central Earthing System Communications Cabinet PV LoG-MHNo. H07V-KName Medium-Voltage System3 4 5 4 TransformerTransfer station Functional DescriptionSuspended loads during transport TransportSetting in Place AssemblyHinge side of the door when closing InstallationConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Operation Start-upWorking with voltages up to 1 kV Contact with voltage ServicingResidual voltage from capacitors Contact with leakage currentHeat generation in resistors Insufficient ventilation of equipmentEntry of water into electrical equipment Obligation to Keep a Written Record Cleaning Maintenance and Inspection Visual InspectionFunctional Test Testing/MeasuringReplacing the Axial Ventilator Care LubricationRotating parts Replacement Work Replacing the Transformer Testing after RepairsRepairs Station roof Roof structure Station framePartial top view TKS-CS example Replacing the MV SwitchgearOngoing Maintenance ScheduleMonthly Every 6 monthsAnnually Storing Spare PartsEvery 2 years Every 4 yearsRemoving Connection Cables Decommissioning and DismantlingDismantling Chemical System Components Disposal Statutory ProvisionsCompact Station TKS-CS Operating Instructions List of Figures List of Tables