2 Safety

The qualified skilled personnel are responsible for safety.

The member of personnel who is responsible for the equipment must ensure that only suitably qualified persons are allowed access to the equipment.

To ensure safety in the electrical operating areas, these areas should be lockable; i.e. suitable locking systems should be installed by the owner on all exterior doors of the compact station.

2.1Installation Location

The equipment is intended for use outdoors as an enclosed electrical unit.

Environmental conditions: (technical data) in accordance with DIN EN 60721-3-4.

Freely accessible air vents for heat dissipation.

Ground pressure: min. 250 kN/m2 (excavation plan) Refer to the technical data for additional criteria.

When selecting the installation location, regional regulations governing noise emissions must be taken into account.

Do not install the equipment in areas subject to flooding or those with a high groundwater level.

2.2Lightning Protection

The connection to the potential equalisation system of the foundation provides the equipment with effective protection against lightning strikes.

The manufacturer’s specifications must be implemented effectively in order to provide the photovoltaic system with suitable lightning protection measures.

Further safety information can be found in the Protect PV Inverter Operating Instructions (BAL).

8000043213 BAL

Page 7 of 39

Image 7
Contents TKS-CS Status Revision Date Name Revision ServiceTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com List of Abbreviations General InformationValidity Appropriate UseInstallation Location SafetyLightning Protection Available to order Scope of DeliveryStructure Equipment SpecificationsDimension DimensionsLow-Voltage Box Low-voltage boxes example AC ConnectionsISO Small Distribution Box Central Earthing System Communications Cabinet PV LoG-MHNo. H07V-KName Medium-Voltage System3 4 5 4 TransformerTransfer station Functional DescriptionSuspended loads during transport TransportSetting in Place AssemblyHinge side of the door when closing InstallationConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Operation Start-upWorking with voltages up to 1 kV Contact with leakage current ServicingContact with voltage Residual voltage from capacitorsHeat generation in resistors Insufficient ventilation of equipmentEntry of water into electrical equipment Obligation to Keep a Written Record Cleaning Maintenance and Inspection Visual InspectionFunctional Test Testing/MeasuringReplacing the Axial Ventilator Care LubricationRotating parts Replacement Work Replacing the Transformer Testing after RepairsRepairs Station roof Roof structure Station framePartial top view TKS-CS example Replacing the MV SwitchgearEvery 6 months Maintenance ScheduleOngoing MonthlyEvery 4 years Storing Spare PartsAnnually Every 2 yearsRemoving Connection Cables Decommissioning and DismantlingDismantling Chemical System Components Disposal Statutory ProvisionsCompact Station TKS-CS Operating Instructions List of Figures List of Tables