AEG TKS-CS operating instructions Table of Contents

Page 3

Compact Station TKS-CS - Operating Instructions

Table of Contents

1

General Information

6

1.1

Validity

6

1.2

Appropriate Use

6

1.3

List of Abbreviations

6

2

Safety

7

2.1

Installation Location

7

2.2

Lightning Protection

7

3

Scope of Delivery

8

4

Equipment Specifications

9

4.1

Structure

9

4.2

Dimensions

10

4.3

Low-Voltage Box

10

4.3.1

AC Connections

11

4.3.2

ISO Small Distribution Box

12

4.3.3

Communications Cabinet PV LoG-MH

13

4.3.4

Central Earthing System

13

4.4

Medium-Voltage System

14

4.5

Transformer

15

5

Functional Description

16

6.

Transport

17

7

Assembly

18

7.1

Setting in Place

18

7.2

Installation

19

7.2.1

Low-Voltage Box

19

7.2.2

ISO Small Distribution Box

20

7.2.3

Communication Interface PV.LoG-MH

20

7.2.4

Central Earthing System

21

7.2.5

Medium-Voltage System

21

7.2.6

Medium-Voltage Transformer

22

7.3

Tightening Torques for Screw Connections

23

8

Start-up

24

9

Operation

24

10

Servicing

25

10.1

Obligation to Keep a Written Record

27

10.2

Maintenance and Inspection

28

10.2.1

Visual Inspection

28

10.2.2

Cleaning

28

10.2.3

Functional Test

29

10.2.4

Testing/Measuring

29

10.2.5

Care

30

10.2.5.1

Lubrication

30

10.2.5.2

Replacing the Axial Ventilator

30

8000043213 BAL

Page 3 of 39

Image 3
Contents TKS-CS Status Revision Date Name Revision ServiceTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com List of Abbreviations General InformationValidity Appropriate UseSafety Installation LocationLightning Protection Available to order Scope of DeliveryStructure Equipment SpecificationsDimensions DimensionLow-Voltage Box Low-voltage boxes example AC ConnectionsISO Small Distribution Box Central Earthing System Communications Cabinet PV LoG-MHNo. H07V-KName Medium-Voltage System3 4 5 4 TransformerTransfer station Functional DescriptionSuspended loads during transport TransportSetting in Place AssemblyInstallation Hinge side of the door when closingConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Start-up OperationWorking with voltages up to 1 kV Contact with leakage current ServicingContact with voltage Residual voltage from capacitorsInsufficient ventilation of equipment Heat generation in resistorsEntry of water into electrical equipment Obligation to Keep a Written Record Cleaning Maintenance and Inspection Visual InspectionFunctional Test Testing/MeasuringCare Lubrication Replacing the Axial VentilatorRotating parts Testing after Repairs Replacement Work Replacing the TransformerRepairs Station roof Roof structure Station framePartial top view TKS-CS example Replacing the MV SwitchgearEvery 6 months Maintenance ScheduleOngoing MonthlyEvery 4 years Storing Spare PartsAnnually Every 2 yearsDecommissioning and Dismantling Removing Connection CablesDismantling Chemical System Components Disposal Statutory ProvisionsCompact Station TKS-CS Operating Instructions List of Figures List of Tables