AEG TKS-CS operating instructions Communications Cabinet PV LoG-MH, Central Earthing System

Page 13

Compact Station TKS-CS - Operating Instructions

4.3.3Communications Cabinet PV LoG-MH

1

5

2

6

 

7

3

 

 

8

3

9

4

 

Figure 6 - PV.LoG-MH (example)

 

 

1

Data logger

5

Ethernet coupler

2

Fuses

6

Data acquisition boards

3

UPS 24 V DC

7

CAN overvoltage protection

4

Short-circuit and

8

Terminal strip

 

overvoltage protection

9

Shield terminals

The compact station TKS-CS features the PV.LoG-MH and a variety of interfaces for monitoring and control.

Data exchange between the PV.LoG-MH and the MH station control systems, the PV.IcX, and the transfer station takes place via Ethernet, modbus, CAN bus and FO cables.

For further information, refer to the PV.LoG-MH Operating Instructions.

4.3.4Central Earthing System

1

2

3

4

5

6

7

Figure 7 - Central earthing system (example)

8000043213 BAL

Page 13 of 39

Image 13
Contents TKS-CS Status Revision Date Name Revision ServiceTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com Validity General InformationAppropriate Use List of AbbreviationsInstallation Location SafetyLightning Protection Available to order Scope of DeliveryStructure Equipment SpecificationsDimension DimensionsLow-Voltage Box Low-voltage boxes example AC ConnectionsISO Small Distribution Box Central Earthing System Communications Cabinet PV LoG-MHNo. H07V-KName Medium-Voltage System3 4 5 4 TransformerTransfer station Functional DescriptionSuspended loads during transport TransportSetting in Place AssemblyHinge side of the door when closing InstallationConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Operation Start-upWorking with voltages up to 1 kV Contact with voltage ServicingResidual voltage from capacitors Contact with leakage currentHeat generation in resistors Insufficient ventilation of equipmentEntry of water into electrical equipment Obligation to Keep a Written Record Cleaning Maintenance and Inspection Visual InspectionFunctional Test Testing/MeasuringReplacing the Axial Ventilator Care LubricationRotating parts Replacement Work Replacing the Transformer Testing after RepairsRepairs Station roof Roof structure Station framePartial top view TKS-CS example Replacing the MV SwitchgearOngoing Maintenance ScheduleMonthly Every 6 monthsAnnually Storing Spare PartsEvery 2 years Every 4 yearsRemoving Connection Cables Decommissioning and DismantlingDismantling Chemical System Components Disposal Statutory ProvisionsCompact Station TKS-CS Operating Instructions List of Figures List of Tables