AEG TKS-CS operating instructions Assembly, Setting in Place

Page 18

Compact Station TKS-CS - Operating Instructions

7 Assembly

7.1Setting in Place

The compact station TKS-CS does not need a foundation. The concrete base serves as its foundation.

 

1

2

3

4

5

2

3

5

Figure 12 - Setting the compact station in place

 

 

1

Ground

 

 

 

4

Transport eyelets

2

Concrete base

 

 

 

5

Transport rod

 

3

Metal housing

 

 

 

 

 

 

 

Using the construction pit pin, create a construction pit on clear ground.

The system may only be installed by crane (Chapter 6 - Transport).

Remove the transport rod after the system has been installed.

Page 18 of 39

8000043213 BAL

Image 18
Contents TKS-CS Revision Service Status Revision Date NameTable of Contents Decommissioning and Dismantling Mailservice.aegpss@aegps.com Appropriate Use General InformationValidity List of AbbreviationsSafety Installation LocationLightning Protection Scope of Delivery Available to orderEquipment Specifications StructureDimensions DimensionLow-Voltage Box AC Connections Low-voltage boxes exampleISO Small Distribution Box Communications Cabinet PV LoG-MH Central Earthing SystemMedium-Voltage System No. H07V-KNameTransformer 3 4 5 4Functional Description Transfer stationTransport Suspended loads during transportAssembly Setting in PlaceInstallation Hinge side of the door when closingConnection Design Torque Communication Interface PV.LoG-MH Medium-voltage system example Medium-Voltage Transformer Tightening Torques for Screw Connections Start-up OperationWorking with voltages up to 1 kV Residual voltage from capacitors ServicingContact with voltage Contact with leakage currentInsufficient ventilation of equipment Heat generation in resistorsEntry of water into electrical equipment Obligation to Keep a Written Record Maintenance and Inspection Visual Inspection CleaningTesting/Measuring Functional TestCare Lubrication Replacing the Axial VentilatorRotating parts Testing after Repairs Replacement Work Replacing the TransformerRepairs Roof structure Station frame Station roofReplacing the MV Switchgear Partial top view TKS-CS exampleMonthly Maintenance ScheduleOngoing Every 6 monthsEvery 2 years Storing Spare PartsAnnually Every 4 yearsDecommissioning and Dismantling Removing Connection CablesDismantling Disposal Statutory Provisions Chemical System ComponentsCompact Station TKS-CS Operating Instructions List of Tables List of Figures