Shindaiwa 4 Cycle Diesel Engine specifications Checking and Maintenance

Page 25

Welding Output

AC Power Output

 

 

 

 

Welding Rod/Current

3-Pase Power use only

1-Phase Power Use only

 

 

 

φ2.0mm/50A or below

9.5kVA or below

7.6kVA or below

 

 

 

φ2.6mm/80A

8.6kVA or below

6.8kVA or below

 

 

 

φ3.2mm/120A

7.2kVA or below

5.7kVA or below

 

 

 

φ4.0mm (φ2.0mmx2)/170A

5.2kVA or below

4.1kVA or below

 

 

 

φ5.0mm (φ2.6mmx2)/220A

3.0kVA or below

2.4kVA or below

 

 

 

φ6.0mm (φ3.2mmx2)/280A

0kVA or below

0kVA or below

( ) indicates 2-Persons Dual Use. (DGW311DM only) <Caution>

zThe simultaneous use of ECO welding and AC power is not available. (DGW311DM only)

DGW311L-(W)380A, DGW311L-(W)400A, DGW311L-(W)415A :

Limitation of AC Power Supply in the simultaneous use of welding and generating (50Hz)

Welding Output

AC Power Output

 

 

 

 

Welding Rod/Current

3-Pase Power use only

1-Phase Power Use only

 

 

 

φ2.0mm/50A or below

8.5kVA or below

6.8kVA or below

 

 

 

φ2.6mm/80A

7.6kVA or below

6.0kVA or below

 

 

 

φ3.2mm/120A

6.2kVA or below

4.9kVA or below

 

 

 

φ4.0mm/170A

4.2kVA or below

3.3kVA or below

 

 

 

φ5.0mm/220A

2.0kVA or below

1.6kVA or below

 

 

 

φ6.0mm/260A

0kVA or below

0kVA or below

11. Checking and Maintenance

Danger : Electric ShockInjuries

zBefore performing any equipment check or maintenance, stop the engine, and remove en- gine key. A person performing the maintenance should always keep the key.

Caution : FireBurns

zWhen checking the engine, always stop the engine, and keep away from fire. Wait until the

engine cools down, before performing any checks.

To optimize the use of this equipment, we recommend the periodical equipment checks and maintenance based on the following matrix.

<Caution>

zThe authorized technicians should perform all checking and maintenance work, except for the pre-startup checks.

zRequest for the maintenance item with mark to the authorized distributor or our engi- neering section.

zThis table only covers the simple checks and maintenance for the engine. For more detailed guide, please refer to the User’s Manual for the engine.

zAlways use our genuine replacement parts.

24

Image 25
Contents DGW311DM DGW311L Introduction Safety Guidelines Page DGW311DM DGW311L DGW311DM DGW311L SpecificationsParts UseEquipment ECO Welding DGW311DM only Monitor Lamp Earth Leakage Breaker Earth Grounding Terminal Bonnet Grounding Grounding ROD Initialization and Pre-check Slow-Down FeatureChecking Engine Oil Checking Coolant/Water SAE10W/30Checking Fuel Lowest Ambient Temperature Mixture Ratio 30% 35% 45%Checking Fuel, Engine Oil and Water Leakage Checking BatteryOperation Initializing/Preparation ⑧ Keep the engine idle for about 5 minutes IshesStopping Generator/Welder „ Restart after stopping due to fuel shortageWelding Operation Selection Welding Cable Connection Welding Cable PolarityECO Single Dual Welding Rod Φ2.0 φ4.0 Φ2.6 φ6.0 Welding Duty Cycle35-280A45-310A φ2.0-φ6.0 『DUAL 』Maximum output from the terminals U, V, W is 10kVA 380V 400V 415V 380V 400V 415V 2.2 1-Phase Output TerminalsOutput Limitation Operation Simultaneous Use of Welding and Generating Checking and Maintenance Adjust Tension V-Belt Clean/Change Fuel FilterAdjust Engine Valve Clearance 50hrsUnscrew the retaining ring by turning counterclockwise, Turn the fuel line valve lever to 『CLOSE』Remove the cup and fuel filter element Long Term Storage Insufficient Fuel TroubleshootingWater or contaminants in fuel Excessive Welding ArcAC Output is Weak No AC outputSlow-Down does not activate Engine does not stop Stop Solenoid disorderDGW311L DGW311DM Engine Wiring DiagramGenerator Wiring Diagram DGW311L W220B DGW311L W380A DGW311L W400A DGW311L W415A Telephone 81-82-849-2220 FAX