HP Performance Optimized Data Center (POD) 240a manual Part Number October Edition

Page 1

HP Performance Optimized Datacenter (POD) 240a

Site Requirements Guide

Part Number: 663155-001

October 2011

Edition: 1

Image 1
Contents Part Number October Edition Page Contents Fire, safety, and security notifications About this document OverviewSite assessment HP Site Preparation Drawing Package Site requirementsSite preparation Early infrastructure requirementsOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightAdditional equipment space requirements Site space and clearance requirementsFuture expansions Suggested assembly installation equipment Preparing for delivery and assemblySafety for assembly Shipping considerationsAssembly prerequisites Temporary lighting and powerStorage requirements Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherProximity to utilities and drains UtilitiesSystem utilities Water supplyWater quality DrainagePower requirements PowerPreparing the site for power Connections to central facility infrastructure Required facility connectionsNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb