HP Performance Optimized Data Center (POD) 240a manual End view shown Component

Page 22

End view shown

Item

Component

 

 

1

Grounding electrode conductor connection

Required facility connections 22

Image 22
Contents Part Number October Edition Page Contents Fire, safety, and security notifications About this document OverviewSite assessment Site preparation Site requirementsHP Site Preparation Drawing Package Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planAdditional equipment space requirements Site space and clearance requirementsFuture expansions Safety for assembly Preparing for delivery and assemblySuggested assembly installation equipment Shipping considerationsAssembly prerequisites Temporary lighting and powerStorage requirements Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherSystem utilities UtilitiesProximity to utilities and drains Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Network connections Required facility connectionsConnections to central facility infrastructure Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb