HP Performance Optimized Data Center (POD) 240a manual Grounding requirements

Page 20

End view shown

Connection portal

Connection point

Quantity per IT

Total quantity per

diameter

 

 

section

HP POD 240a

 

 

 

 

3-inch portal

Networking connection for all IT

4

8

1.5-inch portal

Communication connection for all

2

4

 

communication

 

 

 

ECS

 

 

 

EPO

 

 

 

Fire alarm

 

 

 

Phone

 

 

 

 

 

 

1.5-inch portal

(Optional) vestibule communication

2

4

 

connections

 

 

NOTE: The connection portal location and configuration might look different, depending on the HP POD 240a model.

Grounding requirements

The HP POD 240a structure and internal components are all bonded together. A common Grounding Electrode Conductor Connection point is provided.

WARNING: To avoid the risk of personal injury or electric shock, the HP POD 240a must be properly grounded, and each of the individual sections must be bonded together in accordance with NFPA 70 in accordance with NEC (NA) and IEC (EMEA and APJ).

CAUTION: You must remove any painted surface from all grounding surfaces. Failure to do so results in an ineffective ground.

Grounding and bonding of the HP POD 240a must comply with Article 250 of the NFPA 70 in accordance with NEC (NA) and IEC (EMEA and APJ).

Required facility connections 20

Image 20
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Site assessment OverviewAbout this document Site requirements HP Site Preparation Drawing PackageSite preparation Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planFuture expansions Site space and clearance requirementsAdditional equipment space requirements Preparing for delivery and assembly Suggested assembly installation equipmentSafety for assembly Shipping considerationsStorage requirements Temporary lighting and powerAssembly prerequisites Areas prone to lightning or power surges Environmental considerationsEnvironmental considerations Cold weatherUtilities Proximity to utilities and drainsSystem utilities Water supplyDrainage Water quality Power Power requirementsPreparing the site for power Required facility connections Connections to central facility infrastructureNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb