HP Performance Optimized Data Center (POD) 240a manual

Page 9

End 2 view clearances shown

Side view clearances shown

Space requirements and clearances 9

Image 9
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Overview About this documentSite assessment HP Site Preparation Drawing Package Site requirementsSite preparation Early infrastructure requirementsOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightSite space and clearance requirements Additional equipment space requirementsFuture expansions Suggested assembly installation equipment Preparing for delivery and assemblySafety for assembly Shipping considerationsTemporary lighting and power Assembly prerequisitesStorage requirements Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherProximity to utilities and drains UtilitiesSystem utilities Water supplyWater quality DrainagePower requirements PowerPreparing the site for power Connections to central facility infrastructure Required facility connectionsNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb