Required facility connections

Connections to central facility infrastructure

The HP POD 240a is designed to function standalone but may be connected to existing facility systems with additional engineering and costs.

HP POD 240a Environmental Control System o Operational status

o Power consumption o Environmental status

Life safety systems o EPO

o Fire detection

o Fire suppression

Site communication o Phone

o Security

Networking

o IT connections

Network connections

For information on the network connections, see the HP POD 240a Networking Guide.

Connection portals

The networking and connection portals are located on the cargo-end of the HP POD 240a. There are eight portals per IT section, and each of the different sized portals are used for different connections.

Required facility connections 19

Image 19
Contents Part Number October Edition Page Contents Fire, safety, and security notifications About this document OverviewSite assessment Early infrastructure requirements Site requirementsHP Site Preparation Drawing Package Site preparationOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightAdditional equipment space requirements Site space and clearance requirementsFuture expansions Shipping considerations Preparing for delivery and assemblySuggested assembly installation equipment Safety for assemblyAssembly prerequisites Temporary lighting and powerStorage requirements Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental considerationsWater supply UtilitiesProximity to utilities and drains System utilities Water quality DrainagePower requirements PowerPreparing the site for power Connection portals Required facility connectionsConnections to central facility infrastructure Network connectionsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC