HP POD 240a security

The HP POD 240a is equipped with standard key lock hardware at each personnel entry door and six external electrical cabinets. Each personnel entry door includes a door access contact that can be connected to the customer facility security system. Conduit and junction boxes are provided for customer installed controlled access systems.

Additional options for controlled access security includes:

Electronic card reader

12-digit security code keypad

Magnetic lock on each entry door

Fire, safety, and security notifications

Dry contacts are provided to enable the connection between the HP POD 240a fire alarm system and the customer facility fire system. If the HP POD 240a is connected to the customer facility systems, then the HP POD 240a-initiated alarms, notify the facility systems.

The customer must provide an independent connection for each system listed in the following table.

Alarm

Meaning

 

 

Fire prevention alarm

Smoke has been detected in the HP POD 240a.

Fire suppression

The suppression system alarm has been activated, and

system (optional)

gas will be dispersed to suppress a fire.

Security

A security breach has occurred.

EPO

The EPO system has been activated by an EPO button

 

or thermal event, and shut down the HP POD 240a.

 

 

The electrical layout of the fire alarm system is as described in the schematic drawing that is supplied with the HP Performance Optimized Datacenter (POD) 240a Operations and Maintenance Manual.

Supported facility connections 24

Image 24
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Overview About this documentSite assessment Site requirements HP Site Preparation Drawing PackageSite preparation Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planSite space and clearance requirements Additional equipment space requirementsFuture expansions Preparing for delivery and assembly Suggested assembly installation equipmentSafety for assembly Shipping considerationsTemporary lighting and power Assembly prerequisitesStorage requirements Areas prone to lightning or power surges Environmental considerationsEnvironmental considerations Cold weatherUtilities Proximity to utilities and drainsSystem utilities Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Required facility connections Connections to central facility infrastructureNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb