Overview
About this document
This document outlines the site requirements for an HP Performance Optimized Datacenter (POD) 240a. The customer must provide a qualified architectural or consulting engineering team to generate
Site assessment
HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 240a. Consult with HP to schedule a site assessment.
For more information, see the Site Assessment Checklist in the HP Performance Optimized Datacenter (POD) 240a Site Preparation Guide.
Overview 5