Space requirements and clearances

HP POD 240a dimensions and required clearances

NOTE: Shaded areas indicate required clearances.

Top view clearances shown

End 1 view clearances shown

Space requirements and clearances 8

Image 8
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Site assessment OverviewAbout this document Site requirements HP Site Preparation Drawing PackageSite preparation Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planFuture expansions Site space and clearance requirementsAdditional equipment space requirements Preparing for delivery and assembly Suggested assembly installation equipmentSafety for assembly Shipping considerationsStorage requirements Temporary lighting and powerAssembly prerequisites Areas prone to lightning or power surges Environmental considerationsEnvironmental considerations Cold weatherUtilities Proximity to utilities and drainsSystem utilities Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Required facility connections Connections to central facility infrastructureNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb