Overview

5

About this document

5

Site assessment

5

Site requirements

6

HP Site Preparation Drawing Package

6

Site preparation

6

Early infrastructure requirements

6

Site pad

7

Other structures

7

Space requirements and clearances

8

HP POD 240a dimensions and required clearances

8

HP POD 240a weight

10

HP POD 240a and support equipment sample offload plan

10

Site space and clearance requirements

11

Additional equipment space requirements

11

Future expansions

11

Preparing for delivery and assembly

12

Shipping considerations

12

Suggested assembly installation equipment

12

Safety for assembly

12

Temporary lighting and power

13

Storage requirements

13

Assembly prerequisites

13

Environmental considerations

14

Environmental considerations

14

Cold weather

14

Areas prone to lightning or power surges

14

Seismic activity

14

Utilities

15

Proximity to utilities and drains

15

System utilities

15

Water supply

15

Drainage

16

Power

17

Required facility connections

19

Connections to central facility infrastructure

19

Network connections

19

Connection portals

19

Grounding requirements

20

Supported facility connections

23

Humidifier

23

HP POD 240a security

24

Contents

3

Image 3
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Overview About this documentSite assessment Early infrastructure requirements Site requirementsHP Site Preparation Drawing Package Site preparationOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightSite space and clearance requirements Additional equipment space requirementsFuture expansions Shipping considerations Preparing for delivery and assemblySuggested assembly installation equipment Safety for assemblyTemporary lighting and power Assembly prerequisitesStorage requirements Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental considerationsWater supply UtilitiesProximity to utilities and drains System utilitiesWater quality DrainagePower requirements PowerPreparing the site for power Connection portals Required facility connectionsConnections to central facility infrastructure Network connectionsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb