HP Performance Optimized Data Center (POD) 240a manual Abstract

Page 1

HP Performance Optimized Datacenter 240e

North America (Adiabatic)

Site Preparation and Requirements Guide

Abstract

This guide is intended for the person who operates and maintains the HP Performance Optimized Datacenter 240e NA (HP POD 240e NA).

Part Number: 748898-001

November 2013

Edition: 1

Image 1
Contents Abstract Page Contents Contacting HP Overview Safety and NEC complianceAbout this document Site assessment Site safety and securitySite preparation Fire detectionDimensions and required clearances Weight requirementsSite requirements Site padSite requirements Future expansions RacksGrounding requirements Cold aisle clearanceGrounding electrode System utilities UtilitiesDrain locations PowerSite electrical system Transformers and switchboards Environmental control system Supported facility connectionsConnections to central facility infrastructure Connection portalsECS EPO Fire box Demarcation boxFire, safety, and access notifications Access controlSupported facility connections Environmental considerations Areas prone to lightning or power surgesEnvironmental risks Cold weatherCompleting a site assessment Site plan requirements and actionsHP Site Preparation Drawing Package Zoning and permit requirementsSite planning InstallationLifting requirements Storage requirements Appendix a HP site assessment HP POD 240e NA site assessment checklistDescription Yes Initial Description Initial Installation prerequisites HP POD 240e NA site readiness checklistAppendix B Preparing for delivery Pre-delivery tasksWater supply Adiabatic media water supply Description Sign-off Before you contact HP Contacting HPHP contact information Regulatory compliance notices Safety and NEC complianceHP POD 240e NA regulatory compliance Warranty information Safety and regulatory complianceEPO GlossaryPPE UPS Documentation feedback Index Index
Related manuals
Manual 8 pages 155 b Manual 26 pages 60.09 Kb Manual 93 pages 30.86 Kb