Appendix B: Preparing for delivery

Pre-delivery tasks

Allow adequate time for planning, scheduling, obtaining permits, design approval, inspections, and so on.

Installation prerequisites

Before installing the HP POD 240e NA, verify that the following prerequisites are met:

All components are delivered to the facility.

The HP POD 240e NA and power distribution components are in the final location.

Facility power, water, and drainage are at the final location.

Provisions for properly grounding the HP POD 240e NA are made.

Required clearances exist, including overhead.

All trade personnel required for assembly are coordinated.

HP POD 240e NA site readiness checklist

Before installing the HP POD 240e NA, follow all steps listed in this guide, the site plan, and the following checklists.

Architectural/environmental considerations

Item

Description

Sign-off

 

 

 

 

 

1

Be sure that the following installation requirements are met and

 

 

 

understood by the customer:

 

 

 

POD load pads are in the proper location.

 

 

 

Upon installation, the POD structure must be leveled to ≤

 

 

 

0.5º, which can be checked at that time with a surveyor’s

 

 

 

transit.

 

 

 

Shimming is only allowed at the load pads.

 

 

 

Place shims in increments across the load pads to be sure

 

 

 

that there is sufficient load transfer.

 

 

 

 

 

 

2

Verify that the installation pad is capable of supporting the total

 

 

 

POD solutions weight.

 

 

3

Verify that the HP POD 240e NA site has provisions for

 

 

 

grounding or a grounding system.

 

 

4

Verify that the site pad is physically marked with the locations

 

 

 

of all HP POD 240e NA load pads.

 

 

5

Verify that the HP POD 240e NA is not in the direct path of any

 

 

 

external heat loads, such as generators or a building AHU.

 

 

6

Verify that the installation starting point has been identified and

 

 

 

marked. This is the location where the first HP POD 240e NA

 

 

 

section is placed during installation.

 

 

 

 

Appendix B: Preparing for delivery 28

Image 28
Contents Abstract Page Contents Contacting HP Overview Safety and NEC complianceAbout this document Site safety and security Site assessmentSite preparation Fire detectionWeight requirements Dimensions and required clearancesSite requirements Site padSite requirements Racks Future expansionsCold aisle clearance Grounding requirementsGrounding electrode Utilities System utilitiesPower Drain locationsSite electrical system Transformers and switchboards Supported facility connections Environmental control systemConnections to central facility infrastructure Connection portalsECS EPO Demarcation box Fire boxAccess control Fire, safety, and access notificationsSupported facility connections Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsInstallation Site planningLifting requirements Storage requirements HP POD 240e NA site assessment checklist Appendix a HP site assessmentDescription Yes Initial Description Initial HP POD 240e NA site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksWater supply Adiabatic media water supply Description Sign-off Before you contact HP Contacting HPHP contact information Regulatory compliance notices Safety and NEC complianceHP POD 240e NA regulatory compliance Safety and regulatory compliance Warranty informationGlossary EPOPPE UPS Documentation feedback Index Index
Related manuals
Manual 8 pages 155 b Manual 26 pages 60.09 Kb Manual 93 pages 30.86 Kb