HP Performance Optimized Data Center (POD) 240a manual Supported facility connections

Page 20

The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP Performance Optimized Datacenter 240e NA Site Drawing Package.

Supported facility connections 20

Image 20
Contents Abstract Page Contents Contacting HP About this document Safety and NEC complianceOverview Site safety and security Site assessmentSite preparation Fire detectionWeight requirements Dimensions and required clearancesSite requirements Site padSite requirements Racks Future expansionsCold aisle clearance Grounding requirementsGrounding electrode Utilities System utilitiesPower Drain locationsSite electrical system Transformers and switchboards Supported facility connections Environmental control systemConnections to central facility infrastructure Connection portals ECS EPO Demarcation box Fire boxAccess control Fire, safety, and access notificationsSupported facility connections Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsInstallation Site planningLifting requirements Storage requirements HP POD 240e NA site assessment checklist Appendix a HP site assessmentDescription Yes Initial Description Initial HP POD 240e NA site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksWater supply Adiabatic media water supply Description Sign-off HP contact information Contacting HPBefore you contact HP HP POD 240e NA regulatory compliance Safety and NEC complianceRegulatory compliance notices Safety and regulatory compliance Warranty informationGlossary EPOPPE UPS Documentation feedback Index Index
Related manuals
Manual 8 pages 155 b Manual 26 pages 60.09 Kb Manual 93 pages 30.86 Kb