Index
A
areas prone to lightning or power surges 21 assembly area 23
B
before you contact HP 31 BSMI notice 33
C
capacities 6
cold aisle clearance 10
cold weather considerations 21 connection portals 16 contacting HP 31
D
demarcation box 18 dimensions 7 drain location 13
E
electrical 13
environmental considerations 21 environmental control system (ECS) 16 environmental risks 21
F
facility connections 16 fire and safety 19 fire box 18
fire detection 6 future expansions 9
G
grounding requirements 10
H
HP contact information 31
HP site preparation drawing package 22
J
Japanese notice 33
L
Locations for the HP POD 240e NA and equipment 23
M
modifications, FCC notice 33
O
Other structures 24 overview 5
P
power 13
R
regulatory compliance identification numbers 33 regulatory compliance notices 32, 33 regulatory compliance, HP POD 240e NA 32
S
safety and NEC compliance | 5 | ||
safety considerations | 33 |
| |
safety information 33 |
|
| |
seismic activity | 21 |
|
|
site assessment | 22, 25 |
| |
site planning considerations | 23 | ||
site preparation | 6 |
|
|
site readiness checklist | 28 |
| |
site requirements | 7, 22 |
| |
site safety and security | 6 |
| |
supported facility connections | 16 |
Index 38