A

areas prone to lightning or power surges 21 assembly area 23

B

before you contact HP 31 BSMI notice 33

C

capacities 6

cold aisle clearance 10

cold weather considerations 21 connection portals 16 contacting HP 31

D

demarcation box 18 dimensions 7 drain location 13

E

electrical 13

environmental considerations 21 environmental control system (ECS) 16 environmental risks 21

F

facility connections 16 fire and safety 19 fire box 18

fire detection 6 future expansions 9

G

grounding requirements 10

H

HP contact information 31

HP site preparation drawing package 22

J

Japanese notice 33

L

Locations for the HP POD 240e NA and equipment 23

M

modifications, FCC notice 33

O

Other structures 24 overview 5

P

power 13 pre-delivery 28 preparing for assembly 28 project coordination 22

R

regulatory compliance identification numbers 33 regulatory compliance notices 32, 33 regulatory compliance, HP POD 240e NA 32

S

safety and NEC compliance

5

safety considerations

33

 

safety information 33

 

 

seismic activity

21

 

 

site assessment

22, 25

 

site planning considerations

23

site preparation

6

 

 

site readiness checklist

28

 

site requirements

7, 22

 

site safety and security

6

 

supported facility connections

16

Index 38

Image 38
Contents Abstract Page Contents Contacting HP About this document Safety and NEC complianceOverview Site preparation Site safety and securitySite assessment Fire detectionSite requirements Weight requirementsDimensions and required clearances Site padSite requirements Racks Future expansionsCold aisle clearance Grounding requirementsGrounding electrode Utilities System utilitiesPower Drain locationsSite electrical system Transformers and switchboards Connections to central facility infrastructure Supported facility connectionsEnvironmental control system Connection portalsECS EPO Demarcation box Fire boxAccess control Fire, safety, and access notificationsSupported facility connections Environmental risks Areas prone to lightning or power surgesEnvironmental considerations Cold weatherHP Site Preparation Drawing Package Site plan requirements and actionsCompleting a site assessment Zoning and permit requirementsInstallation Site planningLifting requirements Storage requirements HP POD 240e NA site assessment checklist Appendix a HP site assessmentDescription Yes Initial Description Initial Appendix B Preparing for delivery HP POD 240e NA site readiness checklistInstallation prerequisites Pre-delivery tasksWater supply Adiabatic media water supply Description Sign-off HP contact information Contacting HPBefore you contact HP HP POD 240e NA regulatory compliance Safety and NEC complianceRegulatory compliance notices Safety and regulatory compliance Warranty informationGlossary EPOPPE UPS Documentation feedback Index Index