HP Performance Optimized Data Center (POD) 240a manual Lifting requirements Storage requirements

Page 24

General assembly equipment locations

Lifting requirements

WARNING: The only approved method for lifting any section of the HP POD 240e NA is the use of a spreader bar or harness. Lifting any section of the HP POD 240e NA in any other way can cause damage to the HP POD 240e NA and void your warranty. The harness and lifting connections must be perpendicular to the lifting blocks or connections.

Storage requirements

If the site is not ready for assembly and operation, determine a location for storage when creating the site plan.

CAUTION: The HP POD 240e NA must maintain 20% relative humidity to minimize condensation and oxidation within the HP POD 240e NA.

CAUTION: While being stored, the HP POD 240e NA must be kept in a level position even if stored on a trailer.

Changes in ambient temperatures can cause condensation in a non-operational HP POD 240e NA. If the HP POD 240e NA is placed in storage or is in non-operating mode for over 72 hours, HP recommends using one of the following methods to minimize condensation and oxidation within the HP POD 240e NA:

Desiccant unit

Desiccant material

Heater with a fan

Air conditioner with a heater strip

Consult with HP Services to determine the most effective method.

Other structures

If you provide a vestibule or other structure that will be installed at the HP POD 240e NA site, you must maintain the following specifications:

Flashing must be installed on the exterior of the HP POD 240e NA in the location where the other structure will be attached to protect the HP POD 240e NA and be sure that there is a waterproof barrier.

Access catwalks and landings might be required to maintain the required egress from the HP POD 240e NA HVAC service area.

Access catwalks and landings might be required to maintain the required access to the HP POD 240e NA electrical panels.

Site plan requirements and actions 24

Image 24
Contents Abstract Page Contents Contacting HP Safety and NEC compliance OverviewAbout this document Site safety and security Site assessmentSite preparation Fire detectionWeight requirements Dimensions and required clearancesSite requirements Site padSite requirements Racks Future expansionsCold aisle clearance Grounding requirementsGrounding electrode Utilities System utilitiesPower Drain locationsSite electrical system Transformers and switchboards Supported facility connections Environmental control systemConnections to central facility infrastructure Connection portalsECS EPO Demarcation box Fire boxAccess control Fire, safety, and access notificationsSupported facility connections Areas prone to lightning or power surges Environmental considerationsEnvironmental risks Cold weatherSite plan requirements and actions Completing a site assessmentHP Site Preparation Drawing Package Zoning and permit requirementsInstallation Site planningLifting requirements Storage requirements HP POD 240e NA site assessment checklist Appendix a HP site assessmentDescription Yes Initial Description Initial HP POD 240e NA site readiness checklist Installation prerequisitesAppendix B Preparing for delivery Pre-delivery tasksWater supply Adiabatic media water supply Description Sign-off Contacting HP Before you contact HPHP contact information Safety and NEC compliance Regulatory compliance noticesHP POD 240e NA regulatory compliance Safety and regulatory compliance Warranty informationGlossary EPOPPE UPS Documentation feedback Index Index
Related manuals
Manual 8 pages 155 b Manual 26 pages 60.09 Kb Manual 93 pages 30.86 Kb