HP Performance Optimized Data Center (POD) 240a manual Access control

Page 19

Front view shown

You must make the connections between the facility and the HP POD 240e NA. For configuration and installation instructions, consult with HP.

Access control

The HP POD 240e NA is equipped with standard key lock hardware for each personnel entry door and external electrical cabinet. Each personnel entry door includes a door access contact that can be connected to your facility access control system.

Additional options for controlled access include the following:

Electronic card reader

12-digit access control code keypad

Magnetic lock on each personnel access door and dynamic hot aisle door

Fire, safety, and access notifications

Dry contacts are provided to allow the connection between the HP POD 240e NA and your facility. If the HP POD 240e NA is connected to your facility systems, then the alarm conditions of the HP POD 240e NA can be detected by the facility systems.

It is your responsibility to facilitate these connections. HP can make these connections when specifically contracted to deliver these services and a SOW has been drafted, reviewed, and signed for delivery services.

You must provide an independent connection for each system listed in the following table.

Alarm

Description

 

 

Fire prevention alarm

Smoke is detected in the HP POD 240e NA.

Access control

A door of the POD has been opened.

EPO

The EPO system is activated by manually pressing the

 

EPO button or by a thermal event, and the HP POD

 

240e NA is shut down.

 

 

Supported facility connections 19

Image 19
Contents Abstract Page Contents Contacting HP Overview Safety and NEC complianceAbout this document Fire detection Site safety and securitySite assessment Site preparationSite pad Weight requirementsDimensions and required clearances Site requirementsSite requirements Future expansions RacksGrounding requirements Cold aisle clearanceGrounding electrode System utilities UtilitiesDrain locations PowerSite electrical system Transformers and switchboards Connection portals Supported facility connectionsEnvironmental control system Connections to central facility infrastructureECS EPO Fire box Demarcation boxFire, safety, and access notifications Access controlSupported facility connections Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental risksZoning and permit requirements Site plan requirements and actionsCompleting a site assessment HP Site Preparation Drawing PackageSite planning InstallationLifting requirements Storage requirements Appendix a HP site assessment HP POD 240e NA site assessment checklistDescription Yes Initial Description Initial Pre-delivery tasks HP POD 240e NA site readiness checklistInstallation prerequisites Appendix B Preparing for deliveryWater supply Adiabatic media water supply Description Sign-off Before you contact HP Contacting HPHP contact information Regulatory compliance notices Safety and NEC complianceHP POD 240e NA regulatory compliance Warranty information Safety and regulatory complianceEPO GlossaryPPE UPS Documentation feedback Index Index