HP Performance Optimized Data Center (POD) 240a manual HP POD 240a weight

Page 10

End 1 view clearances shown

HP POD 240a weight

For information on the trucks, deliverables, and the approximate weight of the contents, see the HP POD 240a and support equipment sample offload plan (on page 10). The exact number of required trucks and the components included on each truck might be different depending on the power redundancy in configuration.

NOTE: Allow additional space required to accommodate any additional equipment that is to be installed, such as a generator or UPS.

HP POD 240a and support equipment sample offload plan

This is a sample of trucks and weights for the HP POD 240a structure and equipment that is delivered to the customer site. Each offload plan will vary based on the components purchased, the configuration of the HP POD 240a (redundant and non-redundant). The exact number of required trucks and components included on each truck may differ based on the specific customer POD solution.

Truck*

Contents

Comments

Truck weight (lbs)

 

 

 

 

 

 

1

Generator enclosure P1

Optional

57,935

 

2

Fuel tank for Generator-P1

29,455

 

3

Generator enclosure P2

Optional

57,935

 

4

Fuel tank for Generator-P2

29,455

 

5

UPS enclosure A1

Optional

62,895

 

6a

IT section A without IT installed

Includes racks, PDUs, and

50,000

 

 

 

dropboxes, but has no IT installed.

 

 

6b

IT section A with IT installed

93,000

 

7

Hot aisle

Includes fans and catwalk

23,000

 

8a

IT section B without IT installed

Includes racks, PDUs, and

50,000

 

 

 

dropboxes, but has no IT installed.

 

 

8b

IT section B with IT installed

93,000

 

9

UPS enclosure B1

Optional

62,895

 

10

HVAC/DX cradles 1 and 2

Each with 12 HVAC/DX and a

18,000 per cradle

 

 

 

catwalk

 

 

 

 

Space requirements and clearances 10

Image 10
Contents Part Number October Edition Page Contents Fire, safety, and security notifications About this document OverviewSite assessment Site preparation Site requirementsHP Site Preparation Drawing Package Early infrastructure requirements Site pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planAdditional equipment space requirements Site space and clearance requirementsFuture expansions Safety for assembly Preparing for delivery and assemblySuggested assembly installation equipment Shipping considerationsAssembly prerequisites Temporary lighting and powerStorage requirements Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherSystem utilities UtilitiesProximity to utilities and drains Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Network connections Required facility connectionsConnections to central facility infrastructure Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC