HP Performance Optimized Data Center (POD) 240a Utilities, Proximity to utilities and drains

Page 15

Utilities

Proximity to utilities and drains

Consider proximity to required utilities, such as power, water, and network connections. While required utilities can be brought to nearly any selected site, there is a potential for increased costs and decreased efficiency when the HP POD 240a is located further from the utility source.

For utility clearance information, see HP POD 240a dimensions and required clearances (on page 8).

System utilities

The site location must accommodate the following utilities:

Water supply (on page 15)

Drainage (on page 16)

Power (on page 17)

Water supply

The HP POD 240a requires supply water for the humidifier. The supply water must meet the following requirements:

Requirement

Specification

 

 

Pressure

between 0.1 and 0.8 MPa (1 and

 

8 bars)

Temperature

between 1 and 40 °C

Instant flow-rate

no lower than the rated flow of the

 

fill solenoid valve

 

 

Connection

G3/4M

Hardness

no greater than 40°fH (equal to

 

400 ppm of CaCO3)

 

 

Conductivity

125 to 1250 μS/cm

Organic compounds

None

Do not treat the water with softeners, because softeners might produce foam, which affects the operation of the unit.

Do not use well water, industrial water, water from cooling circuits, or water contaminated by any chemicals or bacteria.

Do not add disinfectants or anti-corrosive compounds to the water, which are potential irritants. For additional dimensions, see the HP Site Preparation Drawing Package (on page 6).

Utilities 15

Image 15
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Overview About this documentSite assessment Early infrastructure requirements Site requirementsHP Site Preparation Drawing Package Site preparationOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightSite space and clearance requirements Additional equipment space requirementsFuture expansions Shipping considerations Preparing for delivery and assemblySuggested assembly installation equipment Safety for assemblyTemporary lighting and power Assembly prerequisitesStorage requirements Cold weather Areas prone to lightning or power surgesEnvironmental considerations Environmental considerationsWater supply UtilitiesProximity to utilities and drains System utilitiesWater quality DrainagePower requirements PowerPreparing the site for power Connection portals Required facility connectionsConnections to central facility infrastructure Network connectionsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb