HP Performance Optimized Data Center (POD) 240a manual

Page 2

© Copyright 2011 Hewlett-Packard Development Company, L.P.

The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein.

Image 2
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Site assessment OverviewAbout this document Site preparation Site requirementsHP Site Preparation Drawing Package Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planFuture expansions Site space and clearance requirementsAdditional equipment space requirements Safety for assembly Preparing for delivery and assemblySuggested assembly installation equipment Shipping considerationsStorage requirements Temporary lighting and powerAssembly prerequisites Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherSystem utilities UtilitiesProximity to utilities and drains Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Network connections Required facility connectionsConnections to central facility infrastructure Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb