HP Performance Optimized Data Center (POD) 240a manual Glossary, Ahj

Page 25

Glossary

AHJ

Authority Having Jurisdiction

door

A hinged portion of an enclosure that covers an opening.

DX

direct expansion

ECS

environmental control system

EPO

emergency power off

equipment

A general term, including fittings, devices, appliances, luminaires, apparatus, machinery, and the like used as a part of, or in connection with, a modular data center. (Source: NEC.)

HVAC

Heating, Ventilation, and Air Conditioning

IEC

International Electrotechnical Commission

ISO

International Organization for Standardization

labeled

Equipment or materials to which has been attached a label, symbol, or other identifying mark of an organization that is acceptable to the authority having jurisdiction and concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner. (Source: NEC.)

Glossary 25

Image 25
Contents Part Number October Edition Page Contents Fire, safety, and security notifications About this document OverviewSite assessment HP Site Preparation Drawing Package Site requirementsSite preparation Early infrastructure requirementsOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightAdditional equipment space requirements Site space and clearance requirementsFuture expansions Suggested assembly installation equipment Preparing for delivery and assemblySafety for assembly Shipping considerationsAssembly prerequisites Temporary lighting and powerStorage requirements Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherProximity to utilities and drains UtilitiesSystem utilities Water supplyWater quality DrainagePower requirements PowerPreparing the site for power Connections to central facility infrastructure Required facility connectionsNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb