HP Performance Optimized Data Center (POD) 240a manual Power requirements

Page 17

Power

IMPORTANT: To provide power to the HP POD 240a, external transformers and switchboards may be required. This equipment must be designed and installed to adhere with local, state, and national codes, and installed by contractors with licensing required by the local jurisdiction; city, township, and state.

For all site preparation drawings, see the HP Site Preparation Drawing Package (on page 6) included on the documentation CD.

Power requirements

The HP POD 240a can be installed as a single source 1N load by providing all required feeders from one common power sources and from common switchboards and transformers, if required. A fully redundant 2N installation can be achieved by feeding the parallel power paths from independent power sources, switchboards and transformers if required.

IMPORTANT: All 3-phase WYE feeders for the HP POD 240a require that the neutrals and the equipment grounding conductors remain isolated. Bonding of the two conductors is allowed at the power source only.

Power feeder requirements:

Feature

Specification

 

 

Enclosure rating

NEMA 3R

Mechanical power for

4

x 300A feeders at 480VΔ, 3-phase, 3-wire, with

cooling system

equipment ground conductor

components

2 x 3" conduit fittings per feeder provided

Critical power for IT

4 x 1000A feeders at 415Y/240V, 3-phase, 4-wire,

equipment

with equipment ground conductors

 

4 x 4" conduit fittings per feeder provided

 

 

 

Total critical power

2N Redundant—1.2 MVA

required for HP POD

Non-redundant—2.4 MVA

240a full capacity

 

 

 

 

 

External power source

When determining the final location of the power connections, consider the following:

Distance between the facility utilities and the location of the transformer and switchboard

Distance between the transformer and switchboard and the HP POD 240a

Distance between the UPS/Generator locations and the HP POD 240a switchboard

Requirements for routing electrical feeders (underground or overhead)

The facility power connection must be installed in compliance with local electrical codes and regulations. HP reference electrical installation design is based on a maximum distance of 15.2 m (50 ft) or line of sight between the switchboard and the HP POD 240a.

Utilities 17

Image 17
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Site assessment OverviewAbout this document HP Site Preparation Drawing Package Site requirementsSite preparation Early infrastructure requirementsOther structures Site padSpace requirements and clearances HP POD 240a dimensions and required clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a and support equipment sample offload plan HP POD 240a weightFuture expansions Site space and clearance requirementsAdditional equipment space requirements Suggested assembly installation equipment Preparing for delivery and assemblySafety for assembly Shipping considerationsStorage requirements Temporary lighting and powerAssembly prerequisites Environmental considerations Areas prone to lightning or power surges Environmental considerations Cold weatherProximity to utilities and drains UtilitiesSystem utilities Water supplyWater quality DrainagePower requirements PowerPreparing the site for power Connections to central facility infrastructure Required facility connectionsNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Humidifier Supported facility connectionsHP POD 240a security Fire, safety, and security notificationsAHJ GlossaryNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb