HP Performance Optimized Data Center (POD) 240a manual Nec

Page 26

listed

Equipment, materials, or services included in a list published by an organization that is acceptable to the authority having jurisdiction and concerned with evaluation of products or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states that either the equipment, material, or service meets appropriate designated standards potential of not more than 42.4 V (DC or peak) supplied by a primary battery or by an isolated secondary circuit, and where the current capacity is limited by an overcurrent device, such as a fuse, or by the inherent capacity of the secondary transformer or power supply, or a combination of a secondary winding and an impedance. A circuit derived from a line-voltage circuit by connecting a resistance in series with the supply circuit to limit the voltage and current is not identified as a low-voltage limited energy circuit. or has been tested and found suitable for a specified purpose. (Source: NEC.)

The means for identifying listed equipment might vary for each organization concerned with product evaluation, some of which do not recognize equipment as listed unless it is also labeled. Use of the system employed by the listing organization allows the authority having jurisdiction to identify a listed product.

NA

North American

NEC

National Electrical Code

NFPA

National Fire Protection Association

overcurrent protection

A device designed to open a circuit when the current through it exceeds a predetermined value. The ampere rating of the device is selected for a circuit to terminate a condition where the current exceeds the rating of conductors and equipment due to overloads, short circuits and faults to ground.

PPE

personal protective equipment

structure

Enclosure of sufficient size to allow entry of personnel.

UL

Underwriters Laboratory

UPS

uninterruptible power system

VESDA

Very Early Smoke Detection Apparatus

Glossary 26

Image 26
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Site assessment OverviewAbout this document Site preparation Site requirementsHP Site Preparation Drawing Package Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planFuture expansions Site space and clearance requirementsAdditional equipment space requirements Safety for assembly Preparing for delivery and assemblySuggested assembly installation equipment Shipping considerationsStorage requirements Temporary lighting and powerAssembly prerequisites Environmental considerations Areas prone to lightning or power surgesEnvironmental considerations Cold weatherSystem utilities UtilitiesProximity to utilities and drains Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Network connections Required facility connectionsConnections to central facility infrastructure Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC
Related manuals
Manual 8 pages 155 b Manual 39 pages 18.56 Kb Manual 93 pages 30.86 Kb