HP Performance Optimized Data Center (POD) 240a manual Preparing for delivery and assembly

Page 12

Preparing for delivery and assembly

Shipping considerations

The HP POD 240a is packaged for shipping such that exposure to weather does not result in damage to the components.

The HP POD 240a is shipped on air-ride trailers to avoid vibrations during shipment.

The HP POD 240a components are shipped based on the assembly plan and available space at the customer site.

Depending on the site location, additional restrictions and permits might be required, which can effect the delivery time line.

Suggested assembly installation equipment

Crane (2)

Forklift (1)

Scissor lift (2)

Boom lift (1)

Temporary flood light towers (2)

Fuel spill containment kit

Portable generator

Safety for assembly

National, state, regional, and local safety regulations must be enforced at all times to prevent work-related injuries. Before installation, HP recommends reviewing the following OSHA safety sections:

Equipment safety—Crane, forklift, scissor-lift, boom-lift, and tools

Traffic safety

Assembly and personnel safety

Electrical safety

Fuel spill containment safety

PPE and head protection

All contractors must adhere to OSHA requirements for the use of PPE to reduce employee exposure to hazards. The construction area around the HP POD 240a construction site is a required hard-hat area, and all personnel who enters the construction site must wear a hard hat, safety vest, and any additional OSHA, HP, and customer required PPE.

Preparing for delivery and assembly 12

Image 12
Contents Part Number October Edition Page Contents Fire, safety, and security notifications Overview About this documentSite assessment Site requirements HP Site Preparation Drawing PackageSite preparation Early infrastructure requirementsSite pad Other structuresHP POD 240a dimensions and required clearances Space requirements and clearancesEnd 2 view clearances shown Side view clearances shown HP POD 240a weight HP POD 240a and support equipment sample offload planSite space and clearance requirements Additional equipment space requirementsFuture expansions Preparing for delivery and assembly Suggested assembly installation equipmentSafety for assembly Shipping considerationsTemporary lighting and power Assembly prerequisitesStorage requirements Areas prone to lightning or power surges Environmental considerationsEnvironmental considerations Cold weatherUtilities Proximity to utilities and drainsSystem utilities Water supplyDrainage Water qualityPower Power requirementsPreparing the site for power Required facility connections Connections to central facility infrastructureNetwork connections Connection portalsGrounding requirements Grounding pad End view shown Component Supported facility connections HumidifierFire, safety, and security notifications HP POD 240a securityGlossary AHJNEC