5 | Start Up and Operation |
|
|
5-1 Pre-Operational Checklist
To ensure the granulator is ready for operation, perform the tasks listed on the following
Have all installation and preparation instructions been read and followed?
Have the granulator operators and all other necessary personnel, such as the cleanout, maintenance and service persons, been fully trained on machine operation and all machine safety mechanisms?
Have the granulator operator and all other necessary personnel, such as the cleanout, maintenance and service persons, read the Operation and Installation Manual?
Have sufficient location clearances been allowed?
Has the equipment been grounded as required by local codes and/or Article 250 of the National Electric Code?
Have all motors been checked for proper rotation?
Have all machine controls, pushbuttons, and limit switch interlocks been checked for proper functioning?
Has the cutting chamber been checked for foreign matter?
Have the drive components been checked for alignment and tension?
Is the machine properly closed with all visible fasteners tight?
Are all accessory components electrically and mechanically connected with proper support and with all fasteners tight?
Are all electrical enclosure boxes tightly closed and clamped shut?
Are all personnel clear of the machine?
Page 30 of 53