Sterling BP1012, BP1018 Operation, Never push material into the hopper with hands

Page 31

5-2 Operation

The granulator can be operated in a vertical top feed position or in a horizontal front feed position.

Before starting the granulator, always check for and remove tools or any other objects placed on the granulator. Turn the Power disconnect switch to “ON”, pull the Start button, and release it when the motor has started.

It is quite normal for the motor not to start immediately, as the electronic system must check all the micro switches before enabling start up procedures. Wait for the electric motor to reach normal rotating speed before feeding the granulator.

!!Warning!!

Never push material into the hopper with hands.

If the hopper becomes blocked, the granulator must be turned off, and the power must be locked out or the fuses removed.

Before stopping the granulator for the end of a working shift or for any other reason, stop feeding in the material to be granulated, and leave the granulator running for several minutes to allow the cutting chamber to completely granulate and empty the material inside. Press the lighted Start/Stop button, which will immediately turn off the granulator.

Important!

If the granulator stalls frequently during use, it may be necessary to adjust the

calibration of the “overload.” (Refer to the values shown in the electrical

diagram.)

Page 31 of 53

Image 31
Contents BP1000 Series Granulators Page Sterling Warranty Information Sterling Warranty Information Table of Contents Start Up and Operation Table of Figures Viii Safety Guidelines Safety ConsiderationsPage Guidelines for Moving the Granulator Safety ProceduresClearing a Jammed Cutting Chamber Safety Features Fitted On the Granulator Safety FeaturesOpening the Granulator Safety SwitchSound Enclosure Wear protective gloves when exposed to knivesModel Motor Power Noise Test Method General Information Using This ManualIntroduction Description Safety Symbols Used in This ManualOptional Equipment Main Components of Standard GranulatorsModel If the Shipment is Not Complete Shipping InformationUnpacking and Inspection Event of Shipping DamageReturns If the Shipment is Not CorrectUncrating Your Granulator Especially the Hopper Lifting InstallationPositioning the Granulator Inserting the Bin Electrical ConnectionChecking the Cutting Chamber Start-Up ChecksRemoving the Screw Knob Checking Rotation DirectionChecking Knife Position Test the Interlock SwitchesChecking the Knife Gap Start Up and Operation Pre-Operational ChecklistNever push material into the hopper with hands OperationGeneral Recommendations MaintenanceDrive Belt Tension Monthly Maintenance OperationsProper Belt Tension Belt Replacement Removal and Replacement of the ScreenRemoving the Screen Inspection and Adjustment of KnivesPage Inspection of Knives Removing and Replacing Bed KnivesRemoval and Replacement of Rotating Blades Specifications for Re-sharpening Bed Knives Bed Knife Specifications Specifications for Re-sharpening Rotor KnivesGeneral Problems 7TroubleshootingProblem Possible Causes Possible Remedies Electrical Problems Spare Parts Recommended Spare Parts ListCutting Chamber Vertical Cross Section Cutting Chamber Longitudal Cross Section Cutting Chamber Front View Cutting Chamber Rear View Typical Wiring Diagram Parts Department Contact InformationService Notes Warranty