Sterling BP1012, BP1018 installation manual Table of Contents

Page 5

Table of Contents

1

Safety Considerations

9

 

1-1

Safety Guidelines

9

 

1-2

Safety Procedures

11

 

 

1-2-1 Guidelines for Moving the Granulator

11

 

 

1-2-2 Clearing a Jammed Cutting Chamber

11

 

1-3

Safety Features

12

 

 

1-3-1 Safety Features Fitted On the Granulator

12

 

 

1-3-2

Opening the Granulator

13

 

 

1-3-3

Sound Enclosure

14

2

General Information

17

 

2-1

Introduction

17

 

2-2

Using This Manual

17

 

2-3 Safety Symbols Used in This Manual

18

 

2-4

Description

18

 

 

2-4-1

Technical Data

18

 

 

2-4-2 Main Components of Standard Granulators

19

 

 

2-4-3

Optional Equipment

19

3

Shipping Information

21

 

3-1

Unpacking and Inspection

21

 

3-2 In the Event of Shipping Damage

21

 

3-3 If the Shipment is Not Complete

21

 

3-4 If the Shipment is Not Correct

22

 

3-5

Returns

 

22

 

3-6

Uncrating Your Granulator

22

4

Installation

 

24

 

4-1

Lifting

 

24

 

4-2

Positioning the Granulator

24

 

4-3

Electrical Connection

25

 

4-4

Start-Up Checks

26

 

 

4-4-1 Checking the Cutting Chamber

26

 

 

4-4-2

Checking Rotation Direction

27

 

 

4-4-3 Test the Interlock Switches

28

 

 

4-4-4

Checking Knife Position

28

Page v of 53

Image 5
Contents BP1000 Series Granulators Page Sterling Warranty Information Sterling Warranty Information Table of Contents Start Up and Operation Table of Figures Viii Safety Guidelines Safety ConsiderationsPage Clearing a Jammed Cutting Chamber Safety ProceduresGuidelines for Moving the Granulator Safety Features Fitted On the Granulator Safety FeaturesOpening the Granulator Safety SwitchSound Enclosure Wear protective gloves when exposed to knivesModel Motor Power Noise Test Method Introduction Using This ManualGeneral Information Description Safety Symbols Used in This ManualOptional Equipment Main Components of Standard GranulatorsModel Unpacking and Inspection Shipping InformationEvent of Shipping Damage If the Shipment is Not CompleteUncrating Your Granulator If the Shipment is Not CorrectReturns Especially the Hopper Positioning the Granulator InstallationLifting Inserting the Bin Electrical ConnectionChecking the Cutting Chamber Start-Up ChecksRemoving the Screw Knob Checking Rotation DirectionChecking Knife Position Test the Interlock SwitchesChecking the Knife Gap Start Up and Operation Pre-Operational ChecklistNever push material into the hopper with hands OperationGeneral Recommendations MaintenanceProper Belt Tension Monthly Maintenance OperationsDrive Belt Tension Belt Replacement Removal and Replacement of the ScreenRemoving the Screen Inspection and Adjustment of KnivesPage Inspection of Knives Removing and Replacing Bed KnivesRemoval and Replacement of Rotating Blades Specifications for Re-sharpening Bed Knives Bed Knife Specifications Specifications for Re-sharpening Rotor KnivesGeneral Problems 7TroubleshootingProblem Possible Causes Possible Remedies Electrical Problems Spare Parts Recommended Spare Parts ListCutting Chamber Vertical Cross Section Cutting Chamber Longitudal Cross Section Cutting Chamber Front View Cutting Chamber Rear View Typical Wiring Diagram Parts Department Contact InformationService Notes Warranty