107272-UIM-B-1105

Use the example below to help you in calculating the duct area to deter- mine whether the ducts have sufficient area so that the furnace oper- ates at the specified external static pressure and within the air temperature rise specified on the nameplate.

Example: The furnace input is 80,000 BTUH, (23.4 kW) 1,200 CFM (34.0 m3). The recommended duct area is 280 inch2 (1, there are two 8 in x 14 in (20.3 cm x 35.6 cm) rectangular ducts attached to the plenum and there are two 7 inch (722 cm2) round ducts attached to the furnace.

1.Take 8 in x 14 in (20.3 cm x 35.6 cm), which equals 112 inch2 X 2 (35.6 cm x 2), which equals 224 inch2 (1445 cm2) then go to round duct size located in Table 3.

TABLE 2: Minimum Duct Sizing For Proper Airflow

2.The square inch area for 7 inch (17.8 cm) round pipe is 38.4, mul- tiply by 2 for two round ducts which equals 76.8 inch2 (495 cm2).

3.Then take the 224 inch2 (1445 cm2) from the rectangular duct and add it to the 76.8 inch2 (495 cm2) of round duct. The total square inch of duct attached to the furnace plenum is 300.8 inch2 (1,940 cm2). This exceeds the recommended 280 inch2 (1,806 cm2) of duct.

In this example, the duct system attached to the plenum has a sufficient area so that the furnace operates at the specified external static pres- sure and within the air temperature rise specified on the nameplate.

Input

Airflow

Return1

Rectangular2

Round2

Supply3

Rectangular2

Round2

BTU/H (kW)

CFM(m³)

In² (cm²)

in. x in.(cm x cm)

in. (cm) dia

In² (cm²)

in. x in. (cm x cm)

in. (cm) dia.

66000 (19.34)

1,050 (29.73)

280 (711)

14 x 20 (35.6 x 50.8)

18(45.7)

216(549)

12 x 18 (30.5 x 45.7)

16 (40.6)

84000 (24.62)

1,250 (35.40)

360 (914)

18 x 20 (45.7 x 50.8)

22(55.8)

280(711)

14 x 20 (35.6 x 50.8)

18 (45.7)

NOTE: This chart does not replace proper duct sizing calculations or take into account static pressure drop for run length and fittings. Watch out for the temperature rise and static pressures.

1.Maximum return air velocity in rigid duct @ 700 feet per minute (19.82 m3 / minute).

2.Example return main trunk duct minimum dimensions.

3.Maximum supply air velocity in rigid duct @ 900 feet per minute (25.49 m3 / minute).

TABLE 3: Round Duct Size

Round Duct Size

Calculated Area For Each Round Duct Size

Inches (cm)

Sq. Inch (cm2)

5 (13)

19.8 (126)

6 (15)

28.2 (182)

7 (18)

38.4 (248)

8 (20)

50.2 (324)

9 (23)

63.6 (410)

10 (25)

78.5 (506)

11 (28)

95.0 (613)

12 (30)

113.1 (730)

13 (33)

132.7 (856)

14 (36)

153.9 (993)

1.The Air Temperature Rise is determined by subtracting the Return Air Temperature Reading from the Supply Air Temperature Read- ing.

2.The External Static Pressure is determined by the Supply Duct Static Pressure reading.

TABLES 2 and 3 are to be used as a guide only to help the installer determine if the duct sizes are large enough to obtain the proper air flow (CFM) through the furnace. TABLES 2 and 3 ARE NOT to be used to design ductwork for the building where the furnace is being installed. There are several variables associated with proper duct sizing that are not included in the tables. To properly design the ductwork for the build- ing, Refer to the ASHRAE Fundamentals Handbook, Chapter on “DUCT DESIGN” or a company that specializes in Residential and Mod- ular Home duct designs.

The supply air temperature MUST NEVER exceed the Maximum Supply Air Temperature, specified on the nameplate.

Operating the furnace above the maximum supply air temperature will cause the heat exchanger to overheat, causing premature heat exchanger failure. Improper duct sizing, dirty air filters, incorrect oil pump pressure, incorrect oil orifice and/or a faulty limit switch can cause the furnace to operate above the maximum supply air tem- perature. Refer to SECTIONS II, III and VIII for additional informa- tion on correcting the problem.

DUCKWORK INSTALLATION

Air Distribution Systems

For proper air distribution, the supply duct system shall be designed so that the static pressure does not exceed the listed static pressure rating on the furnace rating plate.

Three typical distribution systems are illustrated in Figure 3.

Location, size and number of registers should be selected on the basis of best air distribution and floor plan of the home.

The Air Temperature Rise is to be adjusted to obtain a temperature rise within the range(s) specified on the furnace rating plate.

DUCT DESIGN - CANADA

Supply duct design shall be in accordance with the latest HRA Digest, the ASHRAE Handbook Fundamentals, or other good engineering prin- ciples.

NOTE: Refer to HRA Digest Residential Air System Design Manual, Sections 5 and 6, the requirements of which are summarized as fol- lows:

1.The kilowatt output of each duct register shall not exceed 2.35 kW.

2.The furnace output should not be more than 20% greater than the calculated heat loss of the home. If a larger furnace is used, the duct system shall be capable of the increased air volumes neces- sary to maintain a maximum air temperature rise of 50o C as the air passes over the furnace heat exchanger.

3.At least one warm air supply outlet shall be provided in each room.

4.When rooms are located adjacent to the exterior walls, warm air outlets shall be located so as to bathe at least one exterior wall and, where practical, a window area with warm air, except for bath- rooms or kitchens where this might not be practical.

5.Where practical, outlets shall be provided near the exterior doors of the home.

CLEARANCE REQUIREMENTS - CANADA

Supply air ducts from warm air furnaces having a specified minimum plenum clearance shall maintain this clearance from combustible mate- rial for at least the distance specified in CSA Standards CAN/CSA B139, B14.0, B140.10.

6

Unitary Products Group

Image 6
Contents List of Sections Section I SafetyFor Installation List of FiguresSpecific Safety Rules and Precautions Safety RequirementsFollowing requirements to be met Combustion AIR Quality List of Contaminants InspectionTOP Front Back Sides AIR Inlet Roof Jack DUCT1 Check Certifications / ApprovalsFurnace Location and Clearances Piping FLOOR/BOTTOMDuct system’s design and installation must Section II DuctworkDuctwork General Information Duct Design Canada Duckwork InstallationAir Distribution Systems Clearance Requirements CanadaAir Distribution Systems Duct Connectors Installation of Screw Attachment Duct ConnectorInstallation of the Furnace Installation of TAB Attachment Duct ConnectorsFurnace and Air Conditioner Installations MBH CFMBlend AIR Installations Section III FiltersReturn AIR Requirements OIL Safety Section IV OIL PipingConnect Fuel Lines Example Installation and Checking of OIL PipingEffect of Elevation on OIL Burner Firing AFGElectrical Power Connections Section V Electrical PowerSolenoid Wiring ONE Pipe SystemEighteen gauge thermostat wire is highly recommended LOW Voltage Control Wiring ConnectionsVent and Combustion AIR Safety Section VI VENT/COMBUSTION AIR SystemInstallation in Snow Regions Existing Furnace ReplacementNEW Home Installation Exterior Roof Jack ExtensionLocating and Cutting Roof Jack Opening Installing Roof Jack in RoofConnect Roof Jack to Furnace Interior ExtensionsSecure Roof Jack to Roof Complete Installation, as requiredRoof Jack Adjustable Height with Interior ExtensionDfaa Models Dfah Models UIM-B-1105 Installing Ceiling Ring Vent SystemVent Clearances Home Layout Canadian Installations1 US Installation2 Section VII Safety Controls Section Viii START-UP Adjustments SpecificationsSTART-UP and Adjust Burner Ignition System Sequence Adjustment of OIL Pump PressureAdjustment of Temperature Rise SET Combustion with InstrumentsApplying Filter Pressure Drop to Final ProcedureInstall Furnace Doors Determine System AirflowDfaa Model Item Number DescriptionDfah Model Section IX Wiring Diagram OIL-FIRED Furnace Wiring Diagram for Dfaa Oil-Fired FurnaceWiring Diagram for Dfah Oil Furnace Unitary Products Group UIM-B-1105Preparation of Combustion Chamber Installation of Burner and ControlsSection X GAS GUN Burner GAS PipingLocate GAS LEAKS, USE a Soap Solution Testing Piping for LeaksGAS Piping Installation Length of Pipe Nominal Diameter of Pipe in Inches mmGAS Orifice Conversion for Propane LP High Altitude GAS Orifice ConversionPropane GAS Sizing Furnace InputNatural GAS Gas Firing Rate Orifice Air ShutterSection XI START-UP Adjustments PurgingCalculating the Furnace Input Natural GAS USA use the following formula to calculate the furnace input Checking the GAS Pressures Adjustment of Manifold GAS PressureInitial Start UP Inlet GAS Pressure RangeObserving Burner Operation If Furnace Fails to Operate ProperlyPerformance Check Electrode Orientation and Gap Section XII Wiring Diagram GAS Conversion Burner Wiring Diagram for Dfah Gas Gun Unitary 5005 Norman Product York Group Drive 73069 Copyright by York International Corp . All rights reserved