Suggested Bid Form Specifications (continued)
Weather Resistance. Complete unit including outside louver shall be submitted to an independent agency for weather resistance and water infiltration tests.
Air infiltration test to be conducted in accordance with ASTM
1.57lb./ft.2 (.3" H2O) equivalent to 25 mph wind, allowable air infiltration shall not exceed 7 ft.3/min.
Water infiltration test to be conducted in accordance with ASTM
10.0lb./ft2 (1.93" H2O) equivalent to 63 mph wind, 5.0 gal./ft.2 (8" rain/ft.2/hr.) for 15 minutes and there shall be no leakage into the room.
Approvals. Units shall be certified under the ARI and cUL certification program and listed by UL.
Service. Submit complete information with bid covering service availability to whom service on units will be assigned, along with complete address and phone number, including phone number of emergency service personnel.
Warranty. The warranty shall be a full
Installation Responsibility. Units shall be installed according to the manufacturer’s recommendations and the manufacturer shall not be responsible for unit failure as a result of improper installation, or unit performance when installed with accessories not approved by the manufacturer.
53