Nordyne G6RL 90+, G6RC 90+, G6RD 93+ Minimum, Free Area, 40,000 100 sq. 60,000 80,000

Page 12

Vent or Chimney

Each opening must be at least 100 sq. in. or 1 sq. in. per 1000 Btuh of total input rating, whichever is greater. See minimum area per table.

12" Max.

Each opening

 

Vent or

 

Chimney

to outside must

 

 

 

 

be at least

 

 

 

1 sq. in. per

 

 

 

4000 Btuh of

 

 

 

total input

 

 

 

rating.

 

 

 

-

12"

Max

 

 

Furnace

Furnace

12" Max.

 

Water Heater

 

 

 

 

 

 

Minimum

 

 

Total Input

Free Area

Round Duct

Rating (Btuh) (Each Opening)

Diameter

40,000

100 sq. in.

12"

60,000

100 sq. in.

12"

80,000

100 sq. in.

12"

Figure 9. Equipment in a Confined Space with all Combustion Air drawn from Inside

Ventilation Louvers at each end of attic

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12" Max

 

 

Water Heater

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum

 

 

Total Input

 

 

Free Area

Round Duct

Rating (Btuh)

(Each Opening)

Diameter

40,000

10 sq. in.

4"

60,000

15 sq. in.

5"

80,000

20 sq. in.

5"

100,000

25 sq. in.

6"

120,000

30 sq. in.

6"

140,000

35 sq. in.

7"

160,000

40 sq. in.

8"

Figure 10. Equipment in a Confined Space

with all Combustion Air drawn from

Outdoors through Exterior Wall

Vent or

Chimney

Attic

Insulation

Furnace

Water Heater

Air Duct must be at least 1 sq. in. per 4,000 Btuh of total input rating.

Ducts must extend above attic insulation.

Air Duct must be at least 1 sq. in. per 4,000 Btuh of total input rating.

12" Max

 

Vent or

 

 

Chimney

 

 

Ventilation Louvers

 

(each end of attic)

 

-

 

 

Outlet

NOTE: Air open-

 

Air

ings shall each

 

Water

have a free area

Furnace

of not less than

Heater

one square inch

 

 

 

per 4,000 Btuh of

Alternate

 

the total input rat-

Inlet Air

ing of all equipment

Air Inlet

in the enclosure.

 

-

 

 

Minimum

 

Total Input

Free Area

Round Duct

Rating (Btuh)

(Each Opening)

Diameter

40,000

10 sq. in.

4"

60,000

15 sq. in.

5"

80,000

20 sq. in.

5"

100,000

25 sq. in.

6"

120,000

30 sq. in.

6"

140,000

35 sq. in.

7"

160,000

40 sq. in.

8"

Figure 11. Equipment in a Confined Space

with all Combustion Air drawn from Outdoors through Vertical Ducts – from Ventilated Attic

-

-

Ventilation Louvers For

Unheated Crawl Space

Figure 12. Equipment in a Confined Space

with all Combustion Air drawn from

Outdoors through Ventilated Crawl Space

and Ventilated Attic

12

Image 12
Contents Installation Instructions What to do if YOU Smell GASPage Table of Contents Dimensions Upflow G6RC & G6RD FurnacesDownflow G6RL Furnace Furnace Airflow Data High 1910 1860 1780 1700 1620 1520 1420Model Input Motor Number Btuh Speed Installation Requirements Requirements and Codes Clearances to Combustible MaterialsHorizontal Installations Supply AIR Plenum InstallationLocation Downflow Warning G6RL ModelsCirculating AIR Supply Furnace on a Concrete SlabReturn Air Venting and Combustion AIR RequirementsMinimum Free Area40,000 100 sq. 60,000 80,000 Air Requirements For One-Pipe Installation Installation In An Unconfined SpaceInstallation In a Confined Space Air From InsideVenting Requirements Vent Pipe MaterialVent Pipe Length and Diameter Air Directly Through An Exterior WallVent Pipe Installation SolutionExample Pipe Routing and SupportG6RC & G6RD Upflow Furnaces G6RL Downflow FurnacesG6RC & G6RD Upflow FurnacesG6RL Downflow Furnaces G6RC & G6RD Upflow FurnacesLocation of Outdoor Terminations Vent Termination ClearancesAlternate Horizontal Vent Installation Horizontal VentingVertical Venting Vent Freezing ProtectionConcentric Vent Termination Drainage of Condensate from Furnace Vertical Vent TerminationGAS Supply and Piping Leak CheckConversion High Altitude ApplicationNatural Gas High Altitude Conversion LP/Propane Gas Sea Level and High Altitude ConversionElectrical Wiring Line Voltage WiringSTART-UP and Adjustments Low Voltage WiringFurnace Rating Orifice Drill Size Plate Input Btu/h Nat Above Sea LevelStart-Up Procedure Verifying and Adjusting Firing RateElectrical Data Verifying and Adjusting Temperature Rise Verifying Burner OperationGAS Flow Rate Cubic Feet PER Hour Gas Flow RateVerifying Operation of the Supply Air Limit Switch Description of ComponentsG6RC, G6RD and G6RL Integrated Control Board System Diagram For G6RC, G6RD and G6RL Residential FurnacesMaintenance System Operation InformationG6RL Downflow Furnace Location of Major ComponentsHeating Mode Cooling ModeSequence of Operation Fan Mode Furnace Fails to OperateTwinning of Two Furnaces INSTALLATION/PERFORMANCE Check List Fuel Type¢707931*¤