Nordyne G6RC 90+, G6RL 90+, G6RD 93+ GAS Flow Rate Cubic Feet PER Hour, Gas Flow Rate

Page 28

28

GAS FLOW RATE (CUBIC FEET PER HOUR)

Table 12. Gas Flow Rate

 

TIME FOR

CUBIC FEET PER REVOLUTION OF

 

ONE REVOLUTION

 

METER

 

 

(SECONDS)

1

5

10

24

150

750

1500

26

138

692

1385

28

129

643

1286

30

120

600

1200

32

113

563

1125

34

106

529

1059

36

100

500

1000

38

95

474

947

40

90

450

900

42

86

429

857

44

82

409

818

46

78

391

783

48

75

375

750

50

72

360

720

52

69

346

692

54

67

333

667

56

64

321

643

58

62

310

621

60

60

300

600

62

58

290

581

64

56

281

563

TIME FOR

 

CUBIC FEET PER REVOLUTION OF

ONE REVOLUTION

 

 

METER

 

(SECONDS)

 

1

5

10

80

45

225

450

82

44

220

439

84

43

214

429

86

42

209

419

88

41

205

409

90

40

200

400

92

39

196

391

94

38

191

383

96

38

188

375

98

37

184

367

100

36

180

360

102

35

176

353

104

35

173

346

106

34

170

340

108

33

167

333

110

33

164

327

112

32

161

321

114

32

158

316

116

31

155

310

118

31

153

305

120

30

150

300

Image 28
Contents Installation Instructions What to do if YOU Smell GASPage Table of Contents Dimensions Upflow G6RC & G6RD FurnacesDownflow G6RL Furnace Furnace Airflow Data High 1910 1860 1780 1700 1620 1520 1420Model Input Motor Number Btuh Speed Installation Requirements Requirements and Codes Clearances to Combustible MaterialsHorizontal Installations Supply AIR Plenum InstallationLocation Downflow Warning G6RL ModelsCirculating AIR Supply Furnace on a Concrete SlabReturn Air Venting and Combustion AIR RequirementsFree Area Minimum40,000 100 sq. 60,000 80,000 Air Requirements For One-Pipe Installation Installation In An Unconfined SpaceInstallation In a Confined Space Air From InsideVenting Requirements Vent Pipe MaterialVent Pipe Length and Diameter Air Directly Through An Exterior WallVent Pipe Installation SolutionExample Pipe Routing and SupportG6RC & G6RD Upflow Furnaces G6RL Downflow FurnacesG6RC & G6RD Upflow FurnacesG6RL Downflow Furnaces G6RC & G6RD Upflow FurnacesLocation of Outdoor Terminations Vent Termination ClearancesAlternate Horizontal Vent Installation Horizontal VentingVent Freezing Protection Vertical VentingConcentric Vent Termination Drainage of Condensate from Furnace Vertical Vent TerminationGAS Supply and Piping Leak CheckConversion High Altitude ApplicationNatural Gas High Altitude Conversion LP/Propane Gas Sea Level and High Altitude ConversionElectrical Wiring Line Voltage WiringSTART-UP and Adjustments Low Voltage WiringFurnace Rating Orifice Drill Size Plate Input Btu/h Nat Above Sea LevelVerifying and Adjusting Firing Rate Start-Up ProcedureElectrical Data Verifying and Adjusting Temperature Rise Verifying Burner OperationGAS Flow Rate Cubic Feet PER Hour Gas Flow RateVerifying Operation of the Supply Air Limit Switch Description of ComponentsG6RC, G6RD and G6RL Integrated Control Board System Diagram For G6RC, G6RD and G6RL Residential FurnacesMaintenance System Operation InformationG6RL Downflow Furnace Location of Major ComponentsCooling Mode Heating ModeSequence of Operation Furnace Fails to Operate Fan ModeTwinning of Two Furnaces INSTALLATION/PERFORMANCE Check List Fuel Type¢707931*¤