INSTALLATION/PERFORMANCE CHECK LIST

LOCATION __________________________

CITY ____________________ STATE _____

INSTALLER _________________________ CITY ____________________ STATE _____

UNIT MODEL # _______________________

UNIT SERIAL # ________________________

Minimum Clearances per Table 3? ________

Supply Air Temperature: ____________

(° F)

 

 

Return Air Temperature: ____________

(° F)

Electrical Connections tight? _____________

Temperature Rise: ________________

(° F)

 

 

Line Voltage Polarity correct? ____________

Are Flue Connections tight? _____________

 

 

Supply Voltage: ___________________

Volts

Is there Proper Draft? __________________

 

 

Blower Motor HP: _____________________

Is Vent free from restrictions? ____________

 

 

FUEL TYPE:

 

Is the Filter(s) secured in place? __________

 

 

Natural Gas _______ LP/Propane ________

Is the Filter(s) clean? __________________

 

 

Gas Piping Connections leak-tested? ______

Has the Thermostat been calibrated? ______

 

 

Gas Line Pressure: ____________________

Is the Thermostat level? ________________

(in. water column, with furnace operating)

Manifold Pressure: ____________________

Is the Heat Anticipator Setting correct?

____

(in. water column, with furnace operating)

Has the Owner's Information been reviewed

 

 

Is there adequate fresh air supply for

with the home-owner? __________________

combustion and ventilation? _____________

Has the Literature Package been left near the

 

 

Furnace Input: __________________

(Btuh)

furnace? ____________________________

35

Image 35
Contents What to do if YOU Smell GAS Installation InstructionsPage Table of Contents Upflow G6RC & G6RD Furnaces DimensionsDownflow G6RL Furnace High 1910 1860 1780 1700 1620 1520 1420 Furnace Airflow DataModel Input Motor Number Btuh Speed Clearances to Combustible Materials Installation Requirements Requirements and CodesDownflow Warning G6RL Models Horizontal InstallationsSupply AIR Plenum Installation LocationFurnace on a Concrete Slab Circulating AIR SupplyVenting and Combustion AIR Requirements Return Air40,000 100 sq. 60,000 80,000 MinimumFree Area Air From Inside Air Requirements For One-Pipe InstallationInstallation In An Unconfined Space Installation In a Confined SpaceAir Directly Through An Exterior Wall Venting RequirementsVent Pipe Material Vent Pipe Length and DiameterPipe Routing and Support Vent Pipe InstallationSolution ExampleG6RL Downflow Furnaces G6RC & G6RD Upflow FurnacesG6RC & G6RD Upflow Furnaces G6RC & G6RD UpflowFurnaces G6RL Downflow FurnacesVent Termination Clearances Location of Outdoor TerminationsHorizontal Venting Alternate Horizontal Vent InstallationConcentric Vent Termination Vertical VentingVent Freezing Protection Vertical Vent Termination Drainage of Condensate from FurnaceLeak Check GAS Supply and PipingLP/Propane Gas Sea Level and High Altitude Conversion ConversionHigh Altitude Application Natural Gas High Altitude ConversionLine Voltage Wiring Electrical WiringAbove Sea Level START-UP and AdjustmentsLow Voltage Wiring Furnace Rating Orifice Drill Size Plate Input Btu/h NatElectrical Data Start-Up ProcedureVerifying and Adjusting Firing Rate Verifying Burner Operation Verifying and Adjusting Temperature RiseGas Flow Rate GAS Flow Rate Cubic Feet PER HourDescription of Components Verifying Operation of the Supply Air Limit SwitchFor G6RC, G6RD and G6RL Residential Furnaces G6RC, G6RD and G6RL Integrated Control Board System DiagramSystem Operation Information Maintenance Location of Major Components G6RL Downflow FurnaceSequence of Operation Heating ModeCooling Mode Twinning of Two Furnaces Fan ModeFurnace Fails to Operate Fuel Type INSTALLATION/PERFORMANCE Check List¢707931*¤