Nordyne G6RD 93+ Vertical Venting, Vent Freezing Protection, Concentric Vent Termination

Page 20

3.Apply couplings to the vent pipe on the interior and exterior sides of the wall to insure the pipe can not be pushed or pulled through the wall.

4.Insure the combustion air inlet pipe (for a 2 pipe installation) has a 90 degree termina- tion elbow as shown in Figures 19 and 20.

Note that a combustion air intake must be provided with an elbow opening downward. The screen provided with the furnace must be installed in the elbow to prevent entry of debris or creatures.

When the vent pipe must exit an exterior wall close to the grade or expected snow level, a riser should be provided as shown in Figure 18. Insulation is required to prevent freezing of this section of pipe.

Vertical Venting

Figure 20 shows the proper installation and clear- ancesforverticalventtermination. Theroofpenetra- tion must be properly flashed and waterproofed with a plumbing roof boot or equivalent flashing. Termi- nation spacing requirements from the roof and from each other must be per Figure 20.

Vent and combustion air piping may be installed in an existing chimney which is not in use provided that:

a.Both the exhaust vent and air intake run the length of the chimney.

b.The top of the chimney is sealed and weatherproofed.

c.The termination clearances shown in Figure 20 are maintained.

d.No other gas fired appliances are vented through the chimney.

Vent Freezing Protection

When the vent pipe is exposed to temperatures below freezing, i.e., when it passes through unheated spaces, chimneys, etc., the pipe must be insulated with 1/2 inch thick sponge rubber insulation, Armaflex-type insulation or equiva- lent. Insulating pipe is important to avoid con- densate icing.

For extremely cold climates or for conditions of short furnace cycles (i.e. set back thermostat conditions) the last three feet of vent pipe can be reduced one nominal pipe size provided that the total vent length is at least 15 feet in length and the vent is sized in accordance with the venting requirements (Table 5) before this reduction is applied. (Example: 3" to 2-1/2" or 2" to 1-1/2") Smaller vent pipes are less susceptible to freez- ing, but must not be excessively restrictive.

Concentric Vent Termination

A concentric vent termination is approved for use with these furnaces. The kit part number is 903578. For proper installation of the concentric vent termination, follow the installation instruc- tions provided with that kit.

Exhaust Vent

 

 

 

Option B

 

 

 

Mounting Kit

 

 

 

Faceplate Secured

 

 

Exhaust Vent

to Wall with Screws

18" Min.

 

Option A

Combustion

36" Max.

8" Min.

 

Air Inlet

 

 

 

Exhaust Vent

 

 

 

Option C

 

 

 

 

 

18" min.

 

 

18" Min.

36" max.

Grade

 

 

Level

 

36" Max.

12" Min. to

or Normal

7" Min.

 

Snow

 

Normal Snow Level

 

 

 

Inlet

Exhaust

Figure 19. Exhaust and Combustion Air Pipe Clearances

20

Image 20
Contents Installation Instructions What to do if YOU Smell GASPage Table of Contents Dimensions Upflow G6RC & G6RD FurnacesDownflow G6RL Furnace Furnace Airflow Data High 1910 1860 1780 1700 1620 1520 1420Model Input Motor Number Btuh Speed Installation Requirements Requirements and Codes Clearances to Combustible MaterialsHorizontal Installations Supply AIR Plenum InstallationLocation Downflow Warning G6RL ModelsCirculating AIR Supply Furnace on a Concrete SlabReturn Air Venting and Combustion AIR Requirements40,000 100 sq. 60,000 80,000 MinimumFree Area Air Requirements For One-Pipe Installation Installation In An Unconfined SpaceInstallation In a Confined Space Air From InsideVenting Requirements Vent Pipe MaterialVent Pipe Length and Diameter Air Directly Through An Exterior WallVent Pipe Installation SolutionExample Pipe Routing and SupportG6RC & G6RD Upflow Furnaces G6RL Downflow Furnaces G6RC & G6RD Upflow Furnaces G6RL Downflow Furnaces G6RC & G6RD Upflow FurnacesLocation of Outdoor Terminations Vent Termination ClearancesAlternate Horizontal Vent Installation Horizontal VentingConcentric Vent Termination Vertical VentingVent Freezing Protection Drainage of Condensate from Furnace Vertical Vent TerminationGAS Supply and Piping Leak CheckConversion High Altitude ApplicationNatural Gas High Altitude Conversion LP/Propane Gas Sea Level and High Altitude ConversionElectrical Wiring Line Voltage WiringSTART-UP and Adjustments Low Voltage WiringFurnace Rating Orifice Drill Size Plate Input Btu/h Nat Above Sea LevelElectrical Data Start-Up ProcedureVerifying and Adjusting Firing Rate Verifying and Adjusting Temperature Rise Verifying Burner OperationGAS Flow Rate Cubic Feet PER Hour Gas Flow RateVerifying Operation of the Supply Air Limit Switch Description of ComponentsG6RC, G6RD and G6RL Integrated Control Board System Diagram For G6RC, G6RD and G6RL Residential FurnacesMaintenance System Operation InformationG6RL Downflow Furnace Location of Major ComponentsSequence of Operation Heating ModeCooling Mode Twinning of Two Furnaces Fan ModeFurnace Fails to Operate INSTALLATION/PERFORMANCE Check List Fuel Type¢707931*¤