Location

The furnace must be installed on a level surface, and as close to the center of the air distribution system as possible. See Table 3 for overall dimensions to determine the required clear- ances in hallways, doorways, stairs, etc. to allow the furnace to be moved to the installation point. The furnace must be installed so that all electri- cal components are protected from water.

Minimum clearances to combustible materials are listed in Table 4. Access for positioning and servicing must be considered when locating the unit. 24 inches is the minimum required clear- ance for servicing the unit. 30 inches is the minimum required clearance for positioning the unit. 36 inches is the recommended clearance from the front of the unit. Please note that a panel or door can be located such that the minimum clearance on the rating plate is satis- fied, but that panel or door must be removable and allow the appropriate clearance for your installation.

This furnace is certified for use on wood flooring. The furnace must be installed on a solid surface and must be level front to back and side to side. This furnace must not be installed directly on carpeting, tile, or any combustible material other than wood flooring.

DOWNFLOW WARNING (G6RL Models):

The design of the downflow furnace is certified for natural or propane gas and for installation on non-combustible flooring. A special combus- tible floor sub-base is required when installing on a combustible floor. Failure to install the sub- base may result in fire, property damage and personal injury. The special downflow sub-bases are factory supplied accessories, part numbers 902677 and 902974. When the furnace is in- stalled on a factory or site-built cased air condi- tioning coil, the sub-base is not necessary. However, the plenum attached to the coil casing must be installed such that its surfaces are at least 1" from combustible construction.

A gas-fired furnace installed in a residential garage must be installed so that the bottom of the furnace is located a minimum of 15" from the floor. The furnace must be located or protected to avoid physical damage by vehicles.

HORIZONTAL INSTALLATIONS

The G6RC model furnaces are approved for horizontal installation. Installation Kit #903568 is required for horizontal applications. Follow the installation instructions in the kit for proper conversion. NOTE: The G6RD and G6RL mod- els are NOT approved for horizontal installation.

SUPPLY AIR PLENUM INSTALLATION

A.Installation on a concrete slab - G6RL

1.Construct a hole in the floor per the dimensions in Figure 3.

2.Place the plenum and the furnace as shown in Figure 4.

B.Installation on a combustible floor - G6RL

1.Cut and frame the hole in the floor per the dimensions in Figure 5.

2.Place the sub-base for combustible floors over the hole with its duct collar extended downward. Attach the supply air plenum to the base in a manner which will ensure 1" clearancetotheflooringorothercombustible material. Place furnace on the combustible base as shown in Figure 6.

3.When the furnace is installed on a factory or site-built cased air conditioning coil, the sub-base is not necessary. However, the plenum attached to the coil casing must be installed such that its surfaces are at least 1" from combustible material.

18.75"

13.25"

19.25"

19.25"

Hole in

Hole in

Floor

Floor

G6RL 080/100

G6RL 040/060

Figure 3. Opening for Concrete Slab

9

Image 9
Contents What to do if YOU Smell GAS Installation InstructionsPage Table of Contents Upflow G6RC & G6RD Furnaces DimensionsDownflow G6RL Furnace High 1910 1860 1780 1700 1620 1520 1420 Furnace Airflow DataModel Input Motor Number Btuh Speed Clearances to Combustible Materials Installation Requirements Requirements and CodesSupply AIR Plenum Installation Horizontal InstallationsLocation Downflow Warning G6RL ModelsFurnace on a Concrete Slab Circulating AIR SupplyVenting and Combustion AIR Requirements Return AirMinimum Free Area40,000 100 sq. 60,000 80,000 Installation In An Unconfined Space Air Requirements For One-Pipe InstallationInstallation In a Confined Space Air From InsideVent Pipe Material Venting RequirementsVent Pipe Length and Diameter Air Directly Through An Exterior WallSolution Vent Pipe InstallationExample Pipe Routing and SupportG6RL Downflow Furnaces G6RC & G6RD Upflow FurnacesFurnaces G6RC & G6RD UpflowG6RL Downflow Furnaces G6RC & G6RD Upflow FurnacesVent Termination Clearances Location of Outdoor TerminationsHorizontal Venting Alternate Horizontal Vent InstallationVertical Venting Vent Freezing ProtectionConcentric Vent Termination Vertical Vent Termination Drainage of Condensate from FurnaceLeak Check GAS Supply and PipingHigh Altitude Application ConversionNatural Gas High Altitude Conversion LP/Propane Gas Sea Level and High Altitude ConversionLine Voltage Wiring Electrical WiringLow Voltage Wiring START-UP and AdjustmentsFurnace Rating Orifice Drill Size Plate Input Btu/h Nat Above Sea LevelStart-Up Procedure Verifying and Adjusting Firing RateElectrical Data Verifying Burner Operation Verifying and Adjusting Temperature RiseGas Flow Rate GAS Flow Rate Cubic Feet PER HourDescription of Components Verifying Operation of the Supply Air Limit SwitchFor G6RC, G6RD and G6RL Residential Furnaces G6RC, G6RD and G6RL Integrated Control Board System DiagramSystem Operation Information MaintenanceLocation of Major Components G6RL Downflow FurnaceHeating Mode Cooling ModeSequence of Operation Fan Mode Furnace Fails to OperateTwinning of Two Furnaces Fuel Type INSTALLATION/PERFORMANCE Check List¢707931*¤