RV53i

The water heater requires 120 VAC, 60 Hz power from a properly grounded circuit.

If using the 6 foot long power cord, plug it into a standard 3 prong 120 VAC, 60 Hz properly grounded wall outlet. The wiring diagram is located on the Technical Sheet attached to the inside of the front cover.

The water heater must be electrically grounded in accordance with local codes, or in the absence of local codes with the National Electrical Code, ANSI/NFPA 70 and/or the CSA C22.1, Canadian Electrical Code.

RV53e

The water heater must be electrically grounded in accordance with local codes or in the absence of local codes with the most recent edition of the National Electrical Code, ANSI/NFPA 70. In Canada, all electrical wiring should be in accordance with local codes and the Canadian Electrical Code, CSA C22.1 Part 1. Do not rely on the gas or water piping to ground the water heater. A screw is provided in the junction box for the grounding connection.

The water heater requires 120 VAC, 60 Hz power from a properly grounded circuit.

A disconnect switch must be provided and installed for the incoming 120 VAC power. It should be a type that is suitable for outdoor use. Check the National Electrical Code, ANSI/ NFPA 70 and your local codes for a proper switch type to use in your area.

The wiring diagram is located on the Technical Sheet attached to the inside of the front cover.

Gas Piping

General Instructions

A manual gas control valve must be placed in the gas supply line to the Rinnai water heater. A union can be used on the connection above the shut off valve for the future servicing or disconnection of the unit.

Check the type of gas and the gas inlet pressure before connecting the Rinnai water heater. If the Rinnai water heater is not of the gas type that the building is supplied with, DO NOT connect the water heater. Contact the dealer for the proper unit to match the gas type.

Check the gas supply pressure immediately upstream at a location provided by the gas company. Supplied gas pressure must be within the limits shown in the Specifications section.

Before placing the appliance in operation all joints including the heater must be checked for gas tightness by means of leak detector solution, soap and water, or an equivalent nonflammable solution, as applicable. (Since some leak test solutions,

including soap and water, may cause corrosion or stress cracking, the piping shall be rinsed with water after testing, unless it has been determined that the leak test solution is non-corrosive.)

Always use approved connectors to connect the unit to the gas line. Always purge the gas line of any debris before connection to the water heater.

The gas supply line shall be gas tight, sized, and so installed as to provide a supply of gas sufficient to meet the maximum demand of the heater and all other gas consuming appliances at the location without loss of pressure.

Any compound used on the threaded joint of the gas piping shall be a type which resists the action of liquefied petroleum gas (propane / LPG).

Refer to an approved pipe sizing chart if in doubt about the size of the gas line.

16

RV53i & RV53e Operation and Installation Manual

Image 16
Contents Result causing property damage, personal injury or death ANS Z21.10.3 CSATable of Contents Specifications ModelConsumer Safety Information Safety DefinitionsSafety Behaviors and Practices Safety Features Description of OperationHow to Set the Temperature Operating InstructionsTemperature Controller Settings Temperature Options Without a Temperature ControllerModel Temperature Settings Available ºF MCC-91 Temperature ControllerSetting the Water Volume Using the Water Smart / Bath Fill FunctionOverview Setting Controller to Mute Setting the ClockFilling the Tub Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Accessing Operating Information Trouble Shooting for Common IssuesWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsAttachment of the Water Heater Clearances from ApplianceRV53iRV53e Electrical Connection Gas PipingRV53i RV53ePipe Sizing Procedure Example Isolation Valves Installation Instructions Pressure Relief Valve Installation InstructionsPressure Relief Valve Maintenance Water PipingPressure Relief Valve Freeze ProtectionFreeze Protection Methods When the water heater or external piping has frozenManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Error Indication or Air Handler Control Switch RV53iRinnai Water Heater Recommended Piping for Circulation Systems For this applicationInstallation requirements Venting Instructions RV53iIntake / Exhaust Guidelines CondensateVent Products Maximum Vent LengthManufacturer Product Parts Flue Installation Concentric Venting RV53i Description Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances RV53iConnecting Multiple Water Heaters High Altitude InstallationsNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Temperature Controller Installation ConfigurationsLocation Cable Lengths and SizeTemperature Controller Mounting the Controller RV53iMounting the Controller RV53e For Your Safety Read Before Operating Operating InstructionsPressure Drop Curve Technical DataOutlet Flow Data Temperature Setting ReplacementSpace Heating PumpsDimensions RV53eLadder Diagrams Warranty Information Limited WarrantyWhat is covered? Consumer SupportWhat will Rinnai do? How do I get service? What is not covered?Limitation on warranties State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions dutilisation Instructions d’installationSupport à la clientele Instructions dutilisation Temp. d’eauPlages de température avec un contrôleur de température Options de température sans contrôleur de températureModel Arrangements de température disponibles ºF Les températures suggérées sont deEntretien Instructions dinstallation Instructions généralesÉcartements par rapport à lappareil Fixation du chauffe-eauTuyauterie de gaz Installation à altitude élevéeInstructions générales Tuyauterie deau Valve de dégagement de pression Instructions d’InstallationValve à Bille / Valve de dégagement de pression Soupape de sûreté Qualité de leauNiveau maximum Tuyauterie recommandée pour installation de base LégendeConsignes pour aspiration/évacuation Instructions de ventilation RV53iCondensat Produits de ventilation Longueur maximum de ventilationConstructeur Produit Pièces Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Installation de conduit de cheminée RV53i Instructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier FUS TherSupport à la clientèle Linformation de garantieGarantie limitée Quest-ce qui est couvert ?Que fait Rinnai pour exercer la garantie ? Limitation sur les garantiesU287-1821X0100