Rinnai RV53E, RV53I installation manual Additional Clearances, RV53i

Page 28

Additional Clearances

Local codes supersede these clearances.

Avoid termination locations near a dryer vent.

Avoid termination locations near commercial cooking exhaust.

RV53i

 

 

(0.91 m) to ventilated

 

 

36" or unventilated soffit

 

 

or eve vent; or to a

12"

 

deck or porch

V

V

(0.30 m ) to an

 

12"

inside corner

 

 

 

(0.30 m) between

 

 

Rinnai terminals at

 

 

same level

INSIDE

CORNER

V

(1.52 m) vertically

60" between Rinnai terminals

V

(1.52 m) between

60"

(0.30 m) between

Rinnai terminals

Rinnai terminals at

 

at different levels

V

same level

 

 

 

12"

 

V

 

V

V

 

 

 

Vent terminal (represents concentric vent terminal)

(0.61 m) to wall or parapet

24"

V

28

RV53i & RV53e Operation and Installation Manual

Image 28
Contents Result causing property damage, personal injury or death ANS Z21.10.3 CSATable of Contents Specifications ModelConsumer Safety Information Safety DefinitionsSafety Behaviors and Practices Safety Features Description of OperationHow to Set the Temperature Operating InstructionsTemperature Controller Settings Temperature Options Without a Temperature ControllerModel Temperature Settings Available ºF MCC-91 Temperature ControllerSetting the Water Volume Using the Water Smart / Bath Fill FunctionOverview Setting Controller to Mute Setting the ClockFilling the Tub Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Accessing Operating Information Trouble Shooting for Common IssuesWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsAttachment of the Water Heater Clearances from ApplianceRV53iRV53e Electrical Connection Gas PipingRV53i RV53ePipe Sizing Procedure Example Isolation Valves Installation Instructions Pressure Relief Valve Installation InstructionsPressure Relief Valve Maintenance Water PipingPressure Relief Valve Freeze ProtectionFreeze Protection Methods When the water heater or external piping has frozenManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Error Indication or Air Handler Control Switch RV53iRinnai Water Heater Recommended Piping for Circulation Systems For this applicationInstallation requirements Venting Instructions RV53iIntake / Exhaust Guidelines CondensateVent Products Maximum Vent LengthManufacturer Product Parts Flue Installation Concentric Venting RV53i Description Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances RV53iConnecting Multiple Water Heaters High Altitude InstallationsNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Temperature Controller Installation ConfigurationsLocation Cable Lengths and SizeTemperature Controller Mounting the Controller RV53iMounting the Controller RV53e For Your Safety Read Before Operating Operating InstructionsPressure Drop Curve Technical DataOutlet Flow Data Temperature Setting ReplacementSpace Heating PumpsDimensions RV53eLadder Diagrams Warranty Information Limited WarrantyWhat is covered? Consumer SupportWhat will Rinnai do? How do I get service? What is not covered?Limitation on warranties State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions dutilisation Instructions d’installationSupport à la clientele Instructions dutilisation Temp. d’eauPlages de température avec un contrôleur de température Options de température sans contrôleur de températureModel Arrangements de température disponibles ºF Les températures suggérées sont deEntretien Instructions dinstallation Instructions généralesÉcartements par rapport à lappareil Fixation du chauffe-eauTuyauterie de gaz Installation à altitude élevéeInstructions générales Tuyauterie deau Valve de dégagement de pression Instructions d’InstallationValve à Bille / Valve de dégagement de pression Soupape de sûreté Qualité de leauNiveau maximum Tuyauterie recommandée pour installation de base LégendeConsignes pour aspiration/évacuation Instructions de ventilation RV53iCondensat Produits de ventilation Longueur maximum de ventilationConstructeur Produit Pièces Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Installation de conduit de cheminée RV53i Instructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier FUS TherSupport à la clientèle Linformation de garantieGarantie limitée Quest-ce qui est couvert ?Que fait Rinnai pour exercer la garantie ? Limitation sur les garantiesU287-1821X0100