Rinnai RV53I, RV53E State Regulations, Important In the State of Massachusetts 248 CMR 4.00

Page 41

State Regulations

NOTICE BEFORE INSTALLATION

Rinnai direct-vent appliance must be installed by a state qualified or licensed contractor and a properly trained Rinnai Installer. If you are not properly trained, you must not install this unit.

IMPORTANT: In the State of Massachusetts (248 CMR 4.00 & 5.00)

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

1.INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors

a.In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

b.In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

2.APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3.SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL

OBSTRUCTIONS".

4.INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

RV53i & RV53e Operation and Installation Manual

41

Image 41
Contents ANS Z21.10.3 CSA Result causing property damage, personal injury or deathTable of Contents Model SpecificationsSafety Definitions Consumer Safety InformationSafety Behaviors and Practices Safety Features Description of OperationOperating Instructions How to Set the TemperatureTemperature Options Without a Temperature Controller Temperature Controller SettingsModel Temperature Settings Available ºF MCC-91 Temperature ControllerOverview Using the Water Smart / Bath Fill FunctionSetting the Water Volume Setting the Clock Setting Controller to MuteFilling the Tub Models MC-91 and MCC-91Maintenance Code Fault Remedy Error CodesCode Water Quality Trouble Shooting for Common IssuesAccessing Operating Information Circulating Pump Flushing the Heat Exchanger Error Code LC orGeneral Instructions Installation InstructionsRV53iRV53e Clearances from ApplianceAttachment of the Water Heater Gas Piping Electrical ConnectionRV53i RV53ePipe Sizing Procedure Example Pressure Relief Valve Installation Instructions Isolation Valves Installation InstructionsPressure Relief Valve Maintenance Water PipingFreeze Protection Pressure Relief ValveManual draining of the water heater When the water heater or external piping has frozenFreeze Protection Methods KEY Freeze Protection PipingRinnai Water Heater Error Indication or Air Handler Control Switch RV53iRecommended Piping for Basic Installation For this application Recommended Piping for Circulation SystemsVenting Instructions RV53i Installation requirementsIntake / Exhaust Guidelines CondensateManufacturer Product Parts Maximum Vent LengthVent Products Flue Installation Concentric Venting RV53i Flue Terminal Clearances ANS Z21.10.3, CSA Description Canadian Installations US InstallationsRV53i Additional ClearancesHigh Altitude Installations Connecting Multiple Water HeatersNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Configurations Temperature Controller InstallationLocation Cable Lengths and SizeMounting the Controller RV53i Temperature ControllerMounting the Controller RV53e Operating Instructions For Your Safety Read Before OperatingOutlet Flow Data Technical DataPressure Drop Curve Replacement Temperature SettingSpace Heating PumpsRV53e DimensionsLadder Diagrams Limited Warranty Warranty InformationWhat is covered? Consumer SupportLimitation on warranties How do I get service? What is not covered?What will Rinnai do? Important In the State of Massachusetts 248 CMR 4.00 State RegulationsSupport à la clientele Instructions d’installationInstructions dutilisation Temp. d’eau Instructions dutilisationOptions de température sans contrôleur de température Plages de température avec un contrôleur de températureModel Arrangements de température disponibles ºF Les températures suggérées sont deEntretien Instructions générales Instructions dinstallationFixation du chauffe-eau Écartements par rapport à lappareilInstructions générales Installation à altitude élevéeTuyauterie de gaz Valve à Bille / Valve de dégagement de pression Valve de dégagement de pression Instructions d’InstallationTuyauterie deau Niveau maximum Qualité de leauSoupape de sûreté Légende Tuyauterie recommandée pour installation de baseCondensat Instructions de ventilation RV53iConsignes pour aspiration/évacuation Constructeur Produit Pièces Longueur maximum de ventilationProduits de ventilation Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Installation de conduit de cheminée RV53i VanneMa ualmanuelleValve Instructions dutilisationFUS Ther Diagramme en escalierLinformation de garantie Support à la clientèleGarantie limitée Quest-ce qui est couvert ?Limitation sur les garanties Que fait Rinnai pour exercer la garantie ?U287-1821X0100