Trane UNT-SVX07A-EN manual Table M-T-1. Test sequence for 1-heat/1-cool configurations, BOP5 BOP6

Page 66

Maintenance troubleshooting

Verify output wiring and operation without using Rover™, service tool

Force the water valve to open and balance the hydronic system

Note: The manual output test is not an automatic cycle. You must press the TEST button to proceed through each step.

The controller observes all diagnostics that occur during the test sequence. Although an automatic diagnostic reset sequence exists as part of the controller’s normal operation, the automatic diagnos- tic reset feature is not active during the test sequence.

If left in an individual test step, the controller remains in test mode for 60 minutes and then exits to normal operation.

Many service calls are due to unit diagnostics. The test sequence resets unit diagnostics and attempts to restore normal unit operation prior to testing the outputs. If the diagnostics remain after a reset, the STATUS LED indicates the diagnostic condition is still present (two blinks).

Manual Output Test Procedure Follow the procedure below to test the Tracer ZN010, ZN510, and ZN520 controllers.

1.Press and hold the TEST button for at least two seconds (not exceeding 5 seconds), and then release, to start the test mode.

2.The test sequence will turn off all outputs and then attempt to clear all diagnostics.

3.Press the TEST button several more times (no more than once per second) to advance through the test sequence.

The outputs are not subject to minimum times during the test sequence. However, the test sequence only permits one step per second which limits minimum output time.

The green LED is turned off when the TEST button is pressed. To begin the manual output test mode, press and hold the TEST button (turning off the green LED) for at least two seconds.The green LED will begin to blink, indicating the controller is in test mode.

Table M-T-1. Test sequence for 1-heat/1-cool configurations

steps

fan

cool output

heat output

damper

 

BOP1-3

BOP4 (1)

BOP5

BOP6

1. off

off

off

off

closed

2. fan High

high

off

off

closed

3. fan medium

medium

off

off

closed

4. fan low

low

off

off

closed

5. cool

high

on

off

closed

6. heat

high

off

on

closed

7. fresh air

high

off

off

open

damper (3)

 

 

 

 

8. exit

(2)

 

 

 

Notes:

(1)At the beginning of step 2, the controller attempts to clear all diagnostics.

(2)For all 1-heat/1-cool applications including 2-pipe changeover, BOP4 energizes in the cooling test stage and BOP5 energizes in the heat test stage.This occurs even though during normal 2-pipe changeover operation BOP4 controls the unit valve for both cooling and heating.

(2)After the Fresh Air Damper step, the test sequence performs the Exit step.This initiates a reset and attempts to return the controller to normal operation.

(3)The fresh air damper (BOP6) only energizes during this step if binary output 6 has been configured as a fresh air damper.

66

UNT-SVX07A-EN

Image 66
Contents Installation, Operation, and Maintenance Models FC & FF ZO and later design sequenceGeneral information Common Hvac AcronymsContents General Model NumberGeneral Model Number DescriptionDigit 30 control type 0 = none Digit 28 auxiliary control valve 0 = noneDigit 29 piping packages 0 = none Digit 31 control optionTable I-GI-1. Fan-coil component data Table I-GI-2. Low vertical fan-coil component dataModel K low vertical cabinet Available ModelsModel E horizontal recessed Model M inverted vertical cabinetFactory-Installed Piping Packages Vertical Concealed Unit Dimensions & weights, in-lbs DimensionsInstallation Weights Vertical Concealed, Model aVertical Cabinet Unit Dimensions, in-lbs Vertical Cabinet, Model BHorizontal Concealed Unit Dimensions, in-lbs Horizontal Concealed, Model CHorizontal Cabinet Unit Dimensions, in-lbs Horizontal Cabinet, Model DInstallation Dimensions Weights Horizontal Recessed Unit Dimensions, in-lbsHorizontal Recessed, Model E Vertical wall hung cabinet unit dimensions & weights, in-lbs Vertical Wall Hung Cabinet, Model FVertical Recessed Unit Dimensions, in-lbs Vertical Recessed, Model HVertical Slope Top Unit Dimensions, in-lbs Vertical Slope Top, Model JLow Vertical Concealed Unit Dimensions, in-lbs Low Vertical Concealed, Model KLow Vertical Cabinet Unit Dimensions, in-lbs Low Vertical Cabinet, Model LInverted vertical cabinet unit dimensions & weights, in-lbs Inverted Vertical Cabinet, Model MInverted vertical recessed unit dimensions & weights, in-lbs Inverted Vertical Recessed, Model NFan-Coil Coil Connections Vertical Units Horizontal Units Force Flo Coil Connections Vertical Units Horizontal Units Inverted UnitsFresh Air Opening Dimensions, Horizontal Units Fresh Air Opening Dimensions, Vertical Units Wall Box Dimensions Wall BoxProjection Panel Dimensions Projection PanelReceiving and Handling Pre-installation Installation considerationsInstallation Preparation Jobsite StorageService Access Pre-Installation ChecklistDuct Connections Connecting field piping to coilMechanical Piping ConsiderationsCondensate Drain Venting the Hydronic Coil Figure I-MR-4. Close-up view of the changeover sensorBalancing The Manual Circuit Setter Valve Figure I-MR-8. Manual circuit setter valveMechanical Code of System Components in Piping Diagram Steam PipingWall Mounted Control Interconnection Wiring Unit Wiring DiagramsSupply Power Wiring ElectricalTable I-ER-2. Low vertical free discharge motors, 115 volt Table I-ER-3. Decimal to fractional HP kW conversionTable I-ER-8. Fan-coil electric heat kW Table I-ER-9. Electric heat kWTable I-ER-10. Force Flo single-stage, max kW electric heat Table I-ER-11. Force Flo single stage, low kW electric heatTable I-ER-12. Force Flo 2-stage electric heat Installation Installing the UnitUnit Leveling Figure I-IP-3. Zone sensor with on/cancel Comm jack Figure I-IP-5. Zone sensor onlyFan Mode Switch Installation Installing Wall Mounted ControlsWiring Instructions Zone Sensor InstallationInstallation Checklist Unit LevelingPre-startup Communication WiringRecommended Communication Wiring Practices Device AddressingPre-Startup Checklist Installation startup Tracer ZN510 & ZN520 Unit StartupGeneral Information Manual Fan Mode SwitchGeneral Operation information Relay BoardTracer ZN010 & ZN510 Operation Fan Mode Switch OperationSequence Tracer ZN520 OperationBinary Inputs Binary OutputsZone Sensors Fan Mode SwitchAnalog Inputs Supply Fan OperationTracer ZN520 Sequence of Operation Cooling Operation Heating OperationDischarge Air Tempering Fan Mode Operation Continuous Fan OperationManual Fresh Air Damper Fan Start on High SpeedElectric Heat Operation Economizer Damper OptionData Sharing Table O-SO-12. Binary input configurationsTable O-SO-13. Binary output configuration Binary OutputsTable O-SO-14. Analog inputs Table O-SO-15. Analog inputsTable O-SO-16. Zone sensor wiring connections Fan SwitchOn/Cancel Buttons Zone SensorMaintenance diagnostics Table M-D-1. Tracer ZN520 DiagnosticsDiagnostic Reset Translating Multiple DiagnosticsResetting Diagnostics Cycling the Fan SwitchTable M-D-3. Fan outputs do not energize Table M-D-4. Valves Stay ClosedTable M-D-5. Valves Stay Open Table M-D-6. Electric Heat Not Operating Table M-D-7. Fresh Air Damper Stays OpenTable M-D-8. Fresh Air Damper Stays Closed Switch SW1 Controller Type Maintenance troubleshootingTroubleshooting the Relay Board Switch SW2 Electric HeatGreen Status LED Troubleshooting Tracer ZN010, ZN510 & ZN520Red Service LED Yellow Comm LEDTable M-T-1. Test sequence for 1-heat/1-cool configurations BOP5 BOP6Maintenance Maintenance ProceduresMain Drain Pan Coil Maintenance Steam and Hydronic Coil Cleaning ProcedureWinterizing the Coil Control Device Replacement Replacing the MotorMonthly Maintenance Periodic Maintenance ChecklistsMonthly Checklist Annual MaintenanceTypical wiring Csti Fan Speed SwitchCsti Non Fan Speed Switch Line voltage fan speed switch Tracer ZN010 with electric heat Tracer ZN510 with main and auxilliary valves ZN520 with 2-stage electric heat Page Page Page PL-TD-UNT-SVX07A-EN