New Buck Corporation 74 installation instructions Determining The Chimney Location

Page 15
DETERMINING THE CHIMNEY LOCATION

Step (b): Calculate R of proposed system. 4” brick of C=1.25, therefore Rbrick = 1/C = 1/1.25 =0.80 1/8” mineral board of K = 0.29, therefore Rmin.bd. =1/029 x0.125 = 0.431

Step (c): Compare proposed system R of 1.231 to specified R of 0.893. Since proposed system R is greater than required , the system is acceptable.

Definitions:

Thermal conductance = C = Btu = W (hr)(ft²)(°F) (m²)(°K)

Thermal conductance = K = (Btu)(inch) =

W =

(Btu)

(hr)(ft²)(°f)

(m)(°K)

 

(hr)(tf)(°F)

Thermal conductance = R = (ft²)(hr)(°F) = (m²)(°K)

Btu W

Install in accordance with 24 CFR, Part 3280 (HUD).

DETERMINING THE CHIMNEY LOCATION

A.CEILING EXIT (USING SINGLE WALL (minimum 24ga.) pipe and 2100°UL 103 HT type chimney system listed with manufacturer in this section of manual.) (See Page 12.)

1.Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit. (A small weight on a string will serve as a plumb bob.) Mark the ceiling where the string is suspended to locate the center of the chimney.

2.After locating the center of the hole, install the ceiling support box, chimney flashing and rain cap per the chimney manufacturer’s instructions.

Now connect the stove and ceiling support box using #24 ga. minimum blue or black steel connector pipe (DO NOT USE GALVANIZED PIPE). Connect each section so the crimped end faces downward, and secure each section to each other using at least

three (3) sheet metal screws or rivets. Also use three (3) sheet metal screws to fasten pipe to collar on heater. (See Figure 5. Page 14.)

13

Image 15
Contents BUCKSTOVE Page TABLE OF CONTENTS IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL BEFORE INSTALLING YOUR NEW BUCK STOVEINTRODUCTION SECTIONSECTION MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT MODELINSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION MASONRY INSERT INSTALLATIONOPTION B AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION AMOUNTING THE TRIM PANELS INSTALLATION PROCEDUREPOSITIONING THE HEATER POSITIONINGFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATION PREPARING THE STOVE FOR INSTALLATIONheater to the remainder of the home Floor Protection ChimneyDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance COLLAR Alcove Installation ClearancesFINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES RESIDENTIAL / MOBILE HOMECLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL CLEARANCES FOR MODELInstallation of Close Clearance Shields Optional B H C CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR WITH CLOSE CLEARANCE SHIELDSFLOOR PROTECTION SECTION FREESTANDING MOBILE HOME INSTALLATIONTOOLS FOR INSTALLATION PREPARING THE HEATER FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page 1.Recheck the specified clearances FINAL CHECKSECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPOSSIBLE CAUSE SECTION TROUBLESHOOTINGPROBLEM SOLUTIONPROBLEM SOLUTIONPOSSIBLE CAUSE PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE NEW BUCK CORPORATION NBCOTHER RIGHTS CONDITIONS AND EXCLUSIONS