New Buck Corporation 74 installation instructions D. Ceiling Exit-CloseClearance

Page 18
Image 18
Contents BUCKSTOVE Page TABLE OF CONTENTS BEFORE INSTALLING YOUR NEW BUCK STOVE INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMODEL MASONRY INSERT INSTALLATIONMINIMUM CLEARANCE MASONRY INSERT SECTIONMASONRY INSERT INSTALLATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION INSTALLATION OPTIONSOPTION A AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN OPTION BPOSITIONING INSTALLATION PROCEDUREPOSITIONING THE HEATER MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION SECTION RESIDENTIAL FREESTANDING INSTALLATION PREPARING THE STOVE FOR INSTALLATIONheater to the remainder of the home Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLES RESIDENTIAL / MOBILE HOMECLEARANCES FOR MODEL CLEARANCES FOR MODEL CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDSDOUBLE WALL OR SHIELDED SINGLE WALL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional WITH CLOSE CLEARANCE SHIELDS CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLEOR SHIELDED SINGLE WALL CONNECTOR B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONTOOLS FOR INSTALLATION PREPARING THE HEATER FOR INSTALLATIONCHIMNEY PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEPROBLEM SOLUTIONPOSSIBLE CAUSE NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS