New Buck Corporation 74 Option A, Option B, Option C, Starter Pipe Seal Trim Panels And Under

Page 8
OPTION (A)

OPTION (A)

STARTER PIPE

SEAL TRIM PANELS AND UNDER

FRONT OF STOVE UNIT WITH

INSULATION OR HIGH

TEMPERATURE CAULK

NOTE: New Buck Corporation grants no warranty, implied or stated, for the installation or maintenance of your appliance, and assumes no responsibility of any consequential damage

AIRTIGHT INSU-

LATED CLEAN-

OUT

STARTER PIPEFRONT OF STOVE UNIT WITHTEMPERATURE CAULKAIRTIGHT INSU-OR WIRE IT OPENOPTION (B)(Kit sold separately)OPTION (C) REMOVE

DAMPER

OR WIRE IT OPEN

OPTION (B)

NOTE: Follow installation instruction with Direct Connection Kit.

(Kit sold separately)

SEAL TRIM PANELS

WITH INSULATION

OR HIGH

TEMPERATUREManual backgroundManual backgroundManual backgroundManual backgroundManual background

CAULK

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background STAINLESS

STEEL

CHIMNEY

CONNEC-

TOR MUST

EXTEND 1’

PAST THE

BLOCK-OFF

PLATE OR

TO THE

FLUE LINER

AIRTIGHT

INSULATED

CLEAN-

REMOVE

DAMPER

OR WIRE IT

OPEN

BLOCK-OFF PLATE

OR DAMPER

ADAPTER

OPTION (C)

NOTE: Follow installation instruction with Positive Connection Kit.

(Kit sold separately)

INSTALL A NON-COMBUSTIBLE COVER PLATE TO PREVENT WATER FROM ENTERING THE CHIMNEY

TRIM PANELS

CAP(PREVENTS

WATER FROM

ENTERING)

FLUE

LINER

THE LINER MUST

BE STAINLESS

STEEL CONNEC-

TOR OR FLEXIBLE

VENT. FOLLOW

THE LINER MANU-

FACTURE’S IN-

Manual background STRUCTIONS FOR

Manual background INSTALLATION

Manual background AND SUPPORT.

AIRTIGHT

INSULATED

CLEAN-OUT

REMOVE

DAMPER

OR WIRE

IT OPEN

6

Image 8
Contents BUCKSTOVE Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELBEFORE INSTALLING YOUR NEW BUCK STOVE IMPORTANT INSTRUCTIONSSECTION INTRODUCTIONMASONRY INSERT INSTALLATION MINIMUM CLEARANCE MASONRY INSERTMODEL SECTIONPOSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION INSTALLATION OPTIONSAIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPER OR WIRE IT OPENOPTION A OPTION BINSTALLATION PROCEDURE POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION heater to the remainder of the home SECTION RESIDENTIAL FREESTANDING INSTALLATIONPREPARING THE STOVE FOR INSTALLATION Chimney Floor ProtectionDETERMINING THE CHIMNEY LOCATION B. Wall Exit Into Metal Tee-Box Page D. Ceiling Exit-CloseClearance Alcove Installation Clearances COLLARFINAL CHECK CLEARANCES FOR MODEL CLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESRESIDENTIAL / MOBILE HOME CONNECTOR WITHOUT CLOSE CLEARANCE SHIELDS DOUBLE WALL OR SHIELDED SINGLE WALLCLEARANCES FOR MODEL MINIMUM CLEARANCES TO COMBUSTIBLESInstallation of Close Clearance Shields Optional CLEARANCES FOR MODEL ALCOVE INSTALLATION DOUBLE OR SHIELDED SINGLE WALL CONNECTORWITH CLOSE CLEARANCE SHIELDS B H CSECTION FREESTANDING MOBILE HOME INSTALLATION FLOOR PROTECTIONCHIMNEY TOOLS FOR INSTALLATIONPREPARING THE HEATER FOR INSTALLATION PREPARING THE LOCATION FOR ROOM HEATER Ceiling Exit Using Close Clearance listed chimney Page FINAL CHECK 1.Recheck the specified clearancesSECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESECTION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION WARRANTY TIME PERIODS PROCEDURENEW BUCK CORPORATION NBC PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS